HARRY, BERT GAS UNIT #1
HARRY, BERT GAS UNIT #1 is a Texas gas lease in Refugio County, Railroad Commission district 02, operated by Geiser, D. Allen. It has 1 wellbore on file with the Commission. Reported production runs from January 1993 to March 1998, totalling 369,359 thousand cubic feet. The lease is not currently producing.
| Operator | Geiser, D. Allen |
|---|---|
| Field | Bert Harry (Lower Sinton) |
| County | Refugio County, Texas |
| RRC district | 02 |
| Lease number | 131545 |
| Wellbores | 1 |
| Reported production | 369,359 mcf |
| First reported | January 1993 |
| Last reported | March 1998 |
Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal.