MORENO-FARRELL A UNIT

MORENO-FARRELL A UNIT is a Texas gas lease in La Salle County, Railroad Commission district 01, operated by Talisman Energy USA Inc. It has 1 wellbore on file with the Commission. Reported production runs from June 2013 to August 2026, totalling 808,647 thousand cubic feet. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $329K, with roughly $151K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 907 thousand cubic feet a month. Its strongest month on the record we hold was May 2016, at 6,421 thousand cubic feet. In our own backtest, leases producing at this rate are forecast to within about 22% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about MORENO-FARRELL A UNIT

Who operates MORENO-FARRELL A UNIT?
MORENO-FARRELL A UNIT is operated by Talisman Energy USA Inc., Railroad Commission of Texas operator number 835506.
Where is MORENO-FARRELL A UNIT?
MORENO-FARRELL A UNIT is a Texas gas lease in La Salle County, Texas, in Railroad Commission district 01. Its Railroad Commission lease number is 271661.
Is MORENO-FARRELL A UNIT still producing?
MORENO-FARRELL A UNIT is currently producing. The most recent month of production reported to the Railroad Commission of Texas for MORENO-FARRELL A UNIT is August 2026.
How much has MORENO-FARRELL A UNIT produced?
MORENO-FARRELL A UNIT has reported 808,647 thousand cubic feet of gas (Mcf) to the Railroad Commission of Texas between June 2013 and August 2026, from 1 wellbore.
How much is MORENO-FARRELL A UNIT worth?
The remaining production from MORENO-FARRELL A UNIT is estimated to be worth about $329K in total as of 27 August 2026, within a range of $257K to $402K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in MORENO-FARRELL A UNIT is a fraction of it. The estimate fits an Arps decline curve to the production MORENO-FARRELL A UNIT has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for MORENO-FARRELL A UNIT is an estimate of value, not an offer and not an appraisal.
How much income does MORENO-FARRELL A UNIT generate in a year?
MORENO-FARRELL A UNIT is forecast to net about $151K across the whole undivided lease over the twelve months following 27 August 2026, before income tax. A royalty owner in MORENO-FARRELL A UNIT receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

MORENO-FARRELL A UNIT as filed with the Railroad Commission of Texas
OperatorTalisman Energy USA Inc.
FieldHawkville (Eagleford Shale)
CountyLa Salle County, Texas
RRC district01
Lease number271661
Wellbores1
Reported production808,647 mcf
First reported
Last reported
Estimated royalty value$329K

Where MORENO-FARRELL A UNIT sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.