FAITH-SAN PEDRO HH UNIT
FAITH-SAN PEDRO HH UNIT is a Texas gas lease in Dimmit County, Railroad Commission district 01, operated by Chesapeake Operating, L.L.C. It has 1 wellbore on file with the Commission. Reported production runs from August 2015 to August 2026, totalling 1,201,282 thousand cubic feet. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $2.1M, with roughly $454K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 3,627 thousand cubic feet a month. Its strongest month on the record we hold was October 2016, at 24,641 thousand cubic feet. In our own backtest, leases producing at this rate are forecast to within about 17% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.
Key facts about FAITH-SAN PEDRO HH UNIT
- Who operates FAITH-SAN PEDRO HH UNIT?
- FAITH-SAN PEDRO HH UNIT is operated by Chesapeake Operating, L.L.C., Railroad Commission of Texas operator number 147699.
- Where is FAITH-SAN PEDRO HH UNIT?
- FAITH-SAN PEDRO HH UNIT is a Texas gas lease in Dimmit County, Texas, in Railroad Commission district 01. Its Railroad Commission lease number is 278356.
- Is FAITH-SAN PEDRO HH UNIT still producing?
- FAITH-SAN PEDRO HH UNIT is currently producing. The most recent month of production reported to the Railroad Commission of Texas for FAITH-SAN PEDRO HH UNIT is August 2026.
- How much has FAITH-SAN PEDRO HH UNIT produced?
- FAITH-SAN PEDRO HH UNIT has reported 1,201,282 thousand cubic feet of gas (Mcf) to the Railroad Commission of Texas between August 2015 and August 2026, from 1 wellbore.
- How much is FAITH-SAN PEDRO HH UNIT worth?
- The remaining production from FAITH-SAN PEDRO HH UNIT is estimated to be worth about $2.1M in total as of 26 August 2026, within a range of $1.8M to $2.5M. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in FAITH-SAN PEDRO HH UNIT is a fraction of it. The estimate fits an Arps decline curve to the production FAITH-SAN PEDRO HH UNIT has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for FAITH-SAN PEDRO HH UNIT is an estimate of value, not an offer and not an appraisal.
- How much income does FAITH-SAN PEDRO HH UNIT generate in a year?
- FAITH-SAN PEDRO HH UNIT is forecast to net about $454K across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in FAITH-SAN PEDRO HH UNIT receives a fraction of that, set by the decimal interest printed on their check stub.
Lease record
| Operator | Chesapeake Operating, L.L.C. |
|---|---|
| Field | Briscoe Ranch (Eagleford) |
| County | Dimmit County, Texas |
| RRC district | 01 |
| Lease number | 278356 |
| Wellbores | 1 |
| Reported production | 1,201,282 mcf |
| First reported | |
| Last reported | |
| Estimated royalty value | $2.1M |
Where FAITH-SAN PEDRO HH UNIT sits
Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .
Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.