HARPER ALLOCATION A
HARPER ALLOCATION A is a Texas gas lease in La Salle County, Railroad Commission district 01, operated by Ep Energy E&P Company, LLC. It has 1 wellbore on file with the Commission. Reported production runs from April 2024 to August 2026, totalling 385,470 thousand cubic feet. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $36.4M, with roughly $8.0M expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 25,184 thousand cubic feet a month. Its strongest month on the record we hold was July 2025, at 37,490 thousand cubic feet. In our own backtest, leases producing at this rate are forecast to within about 18% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.
Key facts about HARPER ALLOCATION A
- Who operates HARPER ALLOCATION A?
- HARPER ALLOCATION A is operated by Ep Energy E&P Company, LLC, Railroad Commission of Texas operator number 100453.
- Where is HARPER ALLOCATION A?
- HARPER ALLOCATION A is a Texas gas lease in La Salle County, Texas, in Railroad Commission district 01. Its Railroad Commission lease number is 298943.
- Is HARPER ALLOCATION A still producing?
- HARPER ALLOCATION A is currently producing. The most recent month of production reported to the Railroad Commission of Texas for HARPER ALLOCATION A is August 2026.
- How much has HARPER ALLOCATION A produced?
- HARPER ALLOCATION A has reported 385,470 thousand cubic feet of gas (Mcf) to the Railroad Commission of Texas between April 2024 and August 2026, from 1 wellbore.
- How much is HARPER ALLOCATION A worth?
- The remaining production from HARPER ALLOCATION A is estimated to be worth about $36.4M in total as of 26 August 2026, within a range of $29.9M to $43.0M. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in HARPER ALLOCATION A is a fraction of it. The estimate fits an Arps decline curve to the production HARPER ALLOCATION A has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for HARPER ALLOCATION A is an estimate of value, not an offer and not an appraisal.
- How much income does HARPER ALLOCATION A generate in a year?
- HARPER ALLOCATION A is forecast to net about $8.0M across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in HARPER ALLOCATION A receives a fraction of that, set by the decimal interest printed on their check stub.
Lease record
| Operator | Ep Energy E&P Company, LLC |
|---|---|
| Field | Eagleville (Eagle Ford-1) |
| County | La Salle County, Texas |
| RRC district | 01 |
| Lease number | 298943 |
| Wellbores | 1 |
| Reported production | 385,470 mcf |
| First reported | |
| Last reported | |
| Estimated royalty value | $36.4M |
Where HARPER ALLOCATION A sits
Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .
Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.