GW DG UNIT 5-MARLIN SA 2

GW DG UNIT 5-MARLIN SA 2 is a Texas gas lease in Mcmullen County, Railroad Commission district 01, operated by BPX Operating Company. It has 1 wellbore on file with the Commission. Reported production runs from May 2025 to August 2026, totalling 1,884,172 thousand cubic feet. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $3.7M, with roughly $3.4M expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 152,172 thousand cubic feet a month. Its strongest month on the record we hold was July 2025, at 303,514 thousand cubic feet. In our own backtest, leases producing at this rate are forecast to within about 18% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about GW DG UNIT 5-MARLIN SA 2

Who operates GW DG UNIT 5-MARLIN SA 2?
GW DG UNIT 5-MARLIN SA 2 is operated by BPX Operating Company, Railroad Commission of Texas operator number 085408.
Where is GW DG UNIT 5-MARLIN SA 2?
GW DG UNIT 5-MARLIN SA 2 is a Texas gas lease in Mcmullen County, Texas, in Railroad Commission district 01. Its Railroad Commission lease number is 299719.
Is GW DG UNIT 5-MARLIN SA 2 still producing?
GW DG UNIT 5-MARLIN SA 2 is currently producing. The most recent month of production reported to the Railroad Commission of Texas for GW DG UNIT 5-MARLIN SA 2 is August 2026.
How much has GW DG UNIT 5-MARLIN SA 2 produced?
GW DG UNIT 5-MARLIN SA 2 has reported 1,884,172 thousand cubic feet of gas (Mcf) to the Railroad Commission of Texas between May 2025 and August 2026, from 1 wellbore.
How much is GW DG UNIT 5-MARLIN SA 2 worth?
The remaining production from GW DG UNIT 5-MARLIN SA 2 is estimated to be worth about $3.7M in total as of 26 August 2026, within a range of $3.1M to $4.4M. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in GW DG UNIT 5-MARLIN SA 2 is a fraction of it. The estimate fits an Arps decline curve to the production GW DG UNIT 5-MARLIN SA 2 has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for GW DG UNIT 5-MARLIN SA 2 is an estimate of value, not an offer and not an appraisal.
How much income does GW DG UNIT 5-MARLIN SA 2 generate in a year?
GW DG UNIT 5-MARLIN SA 2 is forecast to net about $3.4M across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in GW DG UNIT 5-MARLIN SA 2 receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

GW DG UNIT 5-MARLIN SA 2 as filed with the Railroad Commission of Texas
OperatorBPX Operating Company
FieldEagleville (Eagle Ford-1)
CountyMcmullen County, Texas
RRC district01
Lease number299719
Wellbores1
Reported production1,884,172 mcf
First reported
Last reported
Estimated royalty value$3.7M

Where GW DG UNIT 5-MARLIN SA 2 sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.