CASTILLO-FLORES GU
CASTILLO-FLORES GU is a Texas gas lease in Hidalgo County, Railroad Commission district 04, operated by Coastal Oil & Gas Corporation. It has 1 wellbore on file with the Commission. Reported production runs from July 1999 to August 2026, totalling 4,415,024 thousand cubic feet. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $117K, with roughly $49K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 2,000 thousand cubic feet a month. Its strongest month on the record we hold was February 2022, at 7,493 thousand cubic feet. In our own backtest, leases producing at this rate are forecast to within about 17% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.
Key facts about CASTILLO-FLORES GU
- Who operates CASTILLO-FLORES GU?
- CASTILLO-FLORES GU is operated by Coastal Oil & Gas Corporation, Railroad Commission of Texas operator number 161639.
- Where is CASTILLO-FLORES GU?
- CASTILLO-FLORES GU is a Texas gas lease in Hidalgo County, Texas, in Railroad Commission district 04. Its Railroad Commission lease number is 174002.
- Is CASTILLO-FLORES GU still producing?
- CASTILLO-FLORES GU is currently producing. The most recent month of production reported to the Railroad Commission of Texas for CASTILLO-FLORES GU is August 2026.
- How much has CASTILLO-FLORES GU produced?
- CASTILLO-FLORES GU has reported 4,415,024 thousand cubic feet of gas (Mcf) to the Railroad Commission of Texas between July 1999 and August 2026, from 1 wellbore.
- How much is CASTILLO-FLORES GU worth?
- The remaining production from CASTILLO-FLORES GU is estimated to be worth about $117K in total as of 27 August 2026, within a range of $97K to $137K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in CASTILLO-FLORES GU is a fraction of it. The estimate fits an Arps decline curve to the production CASTILLO-FLORES GU has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for CASTILLO-FLORES GU is an estimate of value, not an offer and not an appraisal.
- How much income does CASTILLO-FLORES GU generate in a year?
- CASTILLO-FLORES GU is forecast to net about $49K across the whole undivided lease over the twelve months following 27 August 2026, before income tax. A royalty owner in CASTILLO-FLORES GU receives a fraction of that, set by the decimal interest printed on their check stub.
Lease record
| Operator | Coastal Oil & Gas Corporation |
|---|---|
| Field | Jeffress, Ne. (Vicksburg T) |
| County | Hidalgo County, Texas |
| RRC district | 04 |
| Lease number | 174002 |
| Wellbores | 1 |
| Reported production | 4,415,024 mcf |
| First reported | |
| Last reported | |
| Estimated royalty value | $117K |
Where CASTILLO-FLORES GU sits
Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .
Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.