DUNLAP II-MCGEE ALLOCATION

DUNLAP II-MCGEE ALLOCATION is a Texas gas lease in Freestone County, Railroad Commission district 05, operated by Xto Energy Inc. It has 1 wellbore on file with the Commission. Reported production runs from January 2019 to August 2026, totalling 6,401,048 thousand cubic feet. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $3.0M, with roughly $545K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 24,689 thousand cubic feet a month. Its strongest month on the record we hold was March 2019, at 323,023 thousand cubic feet. In our own backtest, leases producing at this rate are forecast to within about 18% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about DUNLAP II-MCGEE ALLOCATION

Who operates DUNLAP II-MCGEE ALLOCATION?
DUNLAP II-MCGEE ALLOCATION is operated by Xto Energy Inc., Railroad Commission of Texas operator number 945936.
Where is DUNLAP II-MCGEE ALLOCATION?
DUNLAP II-MCGEE ALLOCATION is a Texas gas lease in Freestone County, Texas, in Railroad Commission district 05. Its Railroad Commission lease number is 286694.
Is DUNLAP II-MCGEE ALLOCATION still producing?
DUNLAP II-MCGEE ALLOCATION is currently producing. The most recent month of production reported to the Railroad Commission of Texas for DUNLAP II-MCGEE ALLOCATION is August 2026.
How much has DUNLAP II-MCGEE ALLOCATION produced?
DUNLAP II-MCGEE ALLOCATION has reported 6,401,048 thousand cubic feet of gas (Mcf) to the Railroad Commission of Texas between January 2019 and August 2026, from 1 wellbore.
How much is DUNLAP II-MCGEE ALLOCATION worth?
The remaining production from DUNLAP II-MCGEE ALLOCATION is estimated to be worth about $3.0M in total as of 27 August 2026, within a range of $2.5M to $3.6M. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in DUNLAP II-MCGEE ALLOCATION is a fraction of it. The estimate fits an Arps decline curve to the production DUNLAP II-MCGEE ALLOCATION has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for DUNLAP II-MCGEE ALLOCATION is an estimate of value, not an offer and not an appraisal.
How much income does DUNLAP II-MCGEE ALLOCATION generate in a year?
DUNLAP II-MCGEE ALLOCATION is forecast to net about $545K across the whole undivided lease over the twelve months following 27 August 2026, before income tax. A royalty owner in DUNLAP II-MCGEE ALLOCATION receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

DUNLAP II-MCGEE ALLOCATION as filed with the Railroad Commission of Texas
OperatorXto Energy Inc.
FieldTeague (CV-Bossier Cons.)
CountyFreestone County, Texas
RRC district05
Lease number286694
Wellbores1
Reported production6,401,048 mcf
First reported
Last reported
Estimated royalty value$3.0M

Where DUNLAP II-MCGEE ALLOCATION sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.