SOUTHERN PINE LUMBER CO.

SOUTHERN PINE LUMBER CO. is a Texas gas lease in Cherokee County, Railroad Commission district 06, operated by Herd Producing Company, Inc. It has 1 wellbore on file with the Commission. Reported production runs from January 1993 to August 2026, totalling 1,221,155 thousand cubic feet. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $9K, with roughly $6K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 908 thousand cubic feet a month. Its strongest month on the record we hold was April 2022, at 22,801 thousand cubic feet. In our own backtest, leases producing at this rate are forecast to within about 22% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about SOUTHERN PINE LUMBER CO.

Who operates SOUTHERN PINE LUMBER CO.?
SOUTHERN PINE LUMBER CO. is operated by Herd Producing Company, Inc., Railroad Commission of Texas operator number 379750.
Where is SOUTHERN PINE LUMBER CO.?
SOUTHERN PINE LUMBER CO. is a Texas gas lease in Cherokee County, Texas, in Railroad Commission district 06. Its Railroad Commission lease number is 081162.
Is SOUTHERN PINE LUMBER CO. still producing?
SOUTHERN PINE LUMBER CO. is currently producing. The most recent month of production reported to the Railroad Commission of Texas for SOUTHERN PINE LUMBER CO. is August 2026.
How much has SOUTHERN PINE LUMBER CO. produced?
SOUTHERN PINE LUMBER CO. has reported 1,221,155 thousand cubic feet of gas (Mcf) to the Railroad Commission of Texas between January 1993 and August 2026, from 1 wellbore.
How much is SOUTHERN PINE LUMBER CO. worth?
The remaining production from SOUTHERN PINE LUMBER CO. is estimated to be worth about $9K in total as of 26 August 2026, within a range of $7K to $11K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in SOUTHERN PINE LUMBER CO. is a fraction of it. The estimate fits an Arps decline curve to the production SOUTHERN PINE LUMBER CO. has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for SOUTHERN PINE LUMBER CO. is an estimate of value, not an offer and not an appraisal.
How much income does SOUTHERN PINE LUMBER CO. generate in a year?
SOUTHERN PINE LUMBER CO. is forecast to net about $6K across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in SOUTHERN PINE LUMBER CO. receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

SOUTHERN PINE LUMBER CO. as filed with the Railroad Commission of Texas
OperatorHerd Producing Company, Inc.
FieldSouthern Pine (Travis Peak)
CountyCherokee County, Texas
RRC district06
Lease number081162
Wellbores1
Reported production1,221,155 mcf
First reported
Last reported
Estimated royalty value$9K

Where SOUTHERN PINE LUMBER CO. sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.