TIMBERSTAR-HT&BRRCO 154
TIMBERSTAR-HT&BRRCO 154 is a Texas gas lease in San Augustine County, Railroad Commission district 06, operated by Cabot Oil & Gas Corporation. It has 1 wellbore on file with the Commission. Reported production runs from April 2008 to August 2026, totalling 1,773,697 thousand cubic feet. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $179K, with roughly $33K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 1,413 thousand cubic feet a month. Its strongest month on the record we hold was May 2016, at 5,908 thousand cubic feet. In our own backtest, leases producing at this rate are forecast to within about 17% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.
Key facts about TIMBERSTAR-HT&BRRCO 154
- Who operates TIMBERSTAR-HT&BRRCO 154?
- TIMBERSTAR-HT&BRRCO 154 is operated by Cabot Oil & Gas Corporation, Railroad Commission of Texas operator number 121700.
- Where is TIMBERSTAR-HT&BRRCO 154?
- TIMBERSTAR-HT&BRRCO 154 is a Texas gas lease in San Augustine County, Texas, in Railroad Commission district 06. Its Railroad Commission lease number is 237970.
- Is TIMBERSTAR-HT&BRRCO 154 still producing?
- TIMBERSTAR-HT&BRRCO 154 is currently producing. The most recent month of production reported to the Railroad Commission of Texas for TIMBERSTAR-HT&BRRCO 154 is August 2026.
- How much has TIMBERSTAR-HT&BRRCO 154 produced?
- TIMBERSTAR-HT&BRRCO 154 has reported 1,773,697 thousand cubic feet of gas (Mcf) to the Railroad Commission of Texas between April 2008 and August 2026, from 1 wellbore.
- How much is TIMBERSTAR-HT&BRRCO 154 worth?
- The remaining production from TIMBERSTAR-HT&BRRCO 154 is estimated to be worth about $179K in total as of 26 August 2026, within a range of $148K to $209K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in TIMBERSTAR-HT&BRRCO 154 is a fraction of it. The estimate fits an Arps decline curve to the production TIMBERSTAR-HT&BRRCO 154 has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for TIMBERSTAR-HT&BRRCO 154 is an estimate of value, not an offer and not an appraisal.
- How much income does TIMBERSTAR-HT&BRRCO 154 generate in a year?
- TIMBERSTAR-HT&BRRCO 154 is forecast to net about $33K across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in TIMBERSTAR-HT&BRRCO 154 receives a fraction of that, set by the decimal interest printed on their check stub.
Lease record
| Operator | Cabot Oil & Gas Corporation |
|---|---|
| Field | Angie (James Lime) |
| County | San Augustine County, Texas |
| RRC district | 06 |
| Lease number | 237970 |
| Wellbores | 1 |
| Reported production | 1,773,697 mcf |
| First reported | |
| Last reported | |
| Estimated royalty value | $179K |
Where TIMBERSTAR-HT&BRRCO 154 sits
Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .
Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.