BUFORD BLOW 3A

BUFORD BLOW 3A is a Texas gas lease in Gregg County, Railroad Commission district 06, operated by Cci East Texas Upstream LLC. It has 1 wellbore on file with the Commission. Reported production runs from April 2018 to August 2026, totalling 7,431,422 thousand cubic feet. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $2.5M, with roughly $566K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 27,615 thousand cubic feet a month. Its strongest month on the record we hold was May 2018, at 305,233 thousand cubic feet. In our own backtest, leases producing at this rate are forecast to within about 18% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about BUFORD BLOW 3A

Who operates BUFORD BLOW 3A?
BUFORD BLOW 3A is operated by Cci East Texas Upstream LLC, Railroad Commission of Texas operator number 120023.
Where is BUFORD BLOW 3A?
BUFORD BLOW 3A is a Texas gas lease in Gregg County, Texas, in Railroad Commission district 06. Its Railroad Commission lease number is 284975.
Is BUFORD BLOW 3A still producing?
BUFORD BLOW 3A is currently producing. The most recent month of production reported to the Railroad Commission of Texas for BUFORD BLOW 3A is August 2026.
How much has BUFORD BLOW 3A produced?
BUFORD BLOW 3A has reported 7,431,422 thousand cubic feet of gas (Mcf) to the Railroad Commission of Texas between April 2018 and August 2026, from 1 wellbore.
How much is BUFORD BLOW 3A worth?
The remaining production from BUFORD BLOW 3A is estimated to be worth about $2.5M in total as of 26 August 2026, within a range of $2.0M to $2.9M. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in BUFORD BLOW 3A is a fraction of it. The estimate fits an Arps decline curve to the production BUFORD BLOW 3A has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for BUFORD BLOW 3A is an estimate of value, not an offer and not an appraisal.
How much income does BUFORD BLOW 3A generate in a year?
BUFORD BLOW 3A is forecast to net about $566K across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in BUFORD BLOW 3A receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

BUFORD BLOW 3A as filed with the Railroad Commission of Texas
OperatorCci East Texas Upstream LLC
FieldCarthage (Haynesville Shale)
CountyGregg County, Texas
RRC district06
Lease number284975
Wellbores1
Reported production7,431,422 mcf
First reported
Last reported
Estimated royalty value$2.5M

Where BUFORD BLOW 3A sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.