KODIAK KBR
KODIAK KBR is a Texas gas lease in San Augustine County, Railroad Commission district 06, operated by Pine Wave Energy Partners Op,LLC. It has 1 wellbore on file with the Commission. Reported production runs from December 2024 to August 2026, totalling 6,764,889 thousand cubic feet. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $16.1M, with roughly $4.3M expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 306,083 thousand cubic feet a month. Its strongest month on the record we hold was January 2025, at 744,235 thousand cubic feet. In our own backtest, leases producing at this rate are forecast to within about 18% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.
Key facts about KODIAK KBR
- Who operates KODIAK KBR?
- KODIAK KBR is operated by Pine Wave Energy Partners Op,LLC, Railroad Commission of Texas operator number 665648.
- Where is KODIAK KBR?
- KODIAK KBR is a Texas gas lease in San Augustine County, Texas, in Railroad Commission district 06. Its Railroad Commission lease number is 299080.
- Is KODIAK KBR still producing?
- KODIAK KBR is currently producing. The most recent month of production reported to the Railroad Commission of Texas for KODIAK KBR is August 2026.
- How much has KODIAK KBR produced?
- KODIAK KBR has reported 6,764,889 thousand cubic feet of gas (Mcf) to the Railroad Commission of Texas between December 2024 and August 2026, from 1 wellbore.
- How much is KODIAK KBR worth?
- The remaining production from KODIAK KBR is estimated to be worth about $16.1M in total as of 26 August 2026, within a range of $13.2M to $19.1M. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in KODIAK KBR is a fraction of it. The estimate fits an Arps decline curve to the production KODIAK KBR has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for KODIAK KBR is an estimate of value, not an offer and not an appraisal.
- How much income does KODIAK KBR generate in a year?
- KODIAK KBR is forecast to net about $4.3M across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in KODIAK KBR receives a fraction of that, set by the decimal interest printed on their check stub.
Lease record
| Operator | Pine Wave Energy Partners Op,LLC |
|---|---|
| Field | Carthage (Haynesville Shale) |
| County | San Augustine County, Texas |
| RRC district | 06 |
| Lease number | 299080 |
| Wellbores | 1 |
| Reported production | 6,764,889 mcf |
| First reported | |
| Last reported | |
| Estimated royalty value | $16.1M |
Where KODIAK KBR sits
Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .
Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.