TALLY-DEGA 12 (AW)

TALLY-DEGA 12 (AW) is a Texas gas lease in Harrison County, Railroad Commission district 06, operated by Rfe Operating, LLC. It has 1 wellbore on file with the Commission. Reported production runs from December 2024 to August 2026, totalling 3,341,438 thousand cubic feet. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $10.3M, with roughly $3.9M expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 241,913 thousand cubic feet a month. Its strongest month on the record we hold was May 2025, at 406,940 thousand cubic feet. In our own backtest, leases producing at this rate are forecast to within about 18% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about TALLY-DEGA 12 (AW)

Who operates TALLY-DEGA 12 (AW)?
TALLY-DEGA 12 (AW) is operated by Rfe Operating, LLC, Railroad Commission of Texas operator number 704776.
Where is TALLY-DEGA 12 (AW)?
TALLY-DEGA 12 (AW) is a Texas gas lease in Harrison County, Texas, in Railroad Commission district 06. Its Railroad Commission lease number is 299412.
Is TALLY-DEGA 12 (AW) still producing?
TALLY-DEGA 12 (AW) is currently producing. The most recent month of production reported to the Railroad Commission of Texas for TALLY-DEGA 12 (AW) is August 2026.
How much has TALLY-DEGA 12 (AW) produced?
TALLY-DEGA 12 (AW) has reported 3,341,438 thousand cubic feet of gas (Mcf) to the Railroad Commission of Texas between December 2024 and August 2026, from 1 wellbore.
How much is TALLY-DEGA 12 (AW) worth?
The remaining production from TALLY-DEGA 12 (AW) is estimated to be worth about $10.3M in total as of 27 August 2026, within a range of $8.5M to $12.2M. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in TALLY-DEGA 12 (AW) is a fraction of it. The estimate fits an Arps decline curve to the production TALLY-DEGA 12 (AW) has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for TALLY-DEGA 12 (AW) is an estimate of value, not an offer and not an appraisal.
How much income does TALLY-DEGA 12 (AW) generate in a year?
TALLY-DEGA 12 (AW) is forecast to net about $3.9M across the whole undivided lease over the twelve months following 27 August 2026, before income tax. A royalty owner in TALLY-DEGA 12 (AW) receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

TALLY-DEGA 12 (AW) as filed with the Railroad Commission of Texas
OperatorRfe Operating, LLC
FieldCarthage (Haynesville Shale)
CountyHarrison County, Texas
RRC district06
Lease number299412
Wellbores1
Reported production3,341,438 mcf
First reported
Last reported
Estimated royalty value$10.3M

Where TALLY-DEGA 12 (AW) sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.