MCENTIRE 2

MCENTIRE 2 is a Texas gas lease in Sterling County, Railroad Commission district 08, operated by Atropos Production Corporation. It has 1 wellbore on file with the Commission. Reported production runs from September 1994 to August 2026, totalling 279,705 thousand cubic feet. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $45K, with roughly $10K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 405 thousand cubic feet a month. Its strongest month on the record we hold was October 2024, at 896 thousand cubic feet. In our own backtest, leases producing at this rate are forecast to within about 22% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about MCENTIRE 2

Who operates MCENTIRE 2?
MCENTIRE 2 is operated by Atropos Production Corporation, Railroad Commission of Texas operator number 036617.
Where is MCENTIRE 2?
MCENTIRE 2 is a Texas gas lease in Sterling County, Texas, in Railroad Commission district 08. Its Railroad Commission lease number is 151079.
Is MCENTIRE 2 still producing?
MCENTIRE 2 is currently producing. The most recent month of production reported to the Railroad Commission of Texas for MCENTIRE 2 is August 2026.
How much has MCENTIRE 2 produced?
MCENTIRE 2 has reported 279,705 thousand cubic feet of gas (Mcf) to the Railroad Commission of Texas between September 1994 and August 2026, from 1 wellbore.
How much is MCENTIRE 2 worth?
The remaining production from MCENTIRE 2 is estimated to be worth about $45K in total as of 27 August 2026, within a range of $35K to $54K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in MCENTIRE 2 is a fraction of it. The estimate fits an Arps decline curve to the production MCENTIRE 2 has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for MCENTIRE 2 is an estimate of value, not an offer and not an appraisal.
How much income does MCENTIRE 2 generate in a year?
MCENTIRE 2 is forecast to net about $10K across the whole undivided lease over the twelve months following 27 August 2026, before income tax. A royalty owner in MCENTIRE 2 receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

MCENTIRE 2 as filed with the Railroad Commission of Texas
OperatorAtropos Production Corporation
FieldConger (Penn)
CountySterling County, Texas
RRC district08
Lease number151079
Wellbores1
Reported production279,705 mcf
First reported
Last reported
Estimated royalty value$45K

Where MCENTIRE 2 sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.