BILL THE CAT

BILL THE CAT is a Texas gas lease in Hill County, Railroad Commission district 09, operated by Quicksilver Resources Inc. It has 1 wellbore on file with the Commission. Reported production runs from May 2007 to August 2026, totalling 1,123,354 thousand cubic feet. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $186K, with roughly $28K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 1,254 thousand cubic feet a month. Its strongest month on the record we hold was August 2016, at 4,053 thousand cubic feet. In our own backtest, leases producing at this rate are forecast to within about 17% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about BILL THE CAT

Who operates BILL THE CAT?
BILL THE CAT is operated by Quicksilver Resources Inc., Railroad Commission of Texas operator number 684830.
Where is BILL THE CAT?
BILL THE CAT is a Texas gas lease in Hill County, Texas, in Railroad Commission district 09. Its Railroad Commission lease number is 236185.
Is BILL THE CAT still producing?
BILL THE CAT is currently producing. The most recent month of production reported to the Railroad Commission of Texas for BILL THE CAT is August 2026.
How much has BILL THE CAT produced?
BILL THE CAT has reported 1,123,354 thousand cubic feet of gas (Mcf) to the Railroad Commission of Texas between May 2007 and August 2026, from 1 wellbore.
How much is BILL THE CAT worth?
The remaining production from BILL THE CAT is estimated to be worth about $186K in total as of 26 August 2026, within a range of $155K to $218K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in BILL THE CAT is a fraction of it. The estimate fits an Arps decline curve to the production BILL THE CAT has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for BILL THE CAT is an estimate of value, not an offer and not an appraisal.
How much income does BILL THE CAT generate in a year?
BILL THE CAT is forecast to net about $28K across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in BILL THE CAT receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

BILL THE CAT as filed with the Railroad Commission of Texas
OperatorQuicksilver Resources Inc.
FieldNewark, East (Barnett Shale)
CountyHill County, Texas
RRC district09
Lease number236185
Wellbores1
Reported production1,123,354 mcf
First reported
Last reported
Estimated royalty value$186K

Where BILL THE CAT sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.