GEORGE 11

GEORGE 11 is a Texas gas lease in Hemphill County, Railroad Commission district 10, operated by Cimarex Energy Co. It has 1 wellbore on file with the Commission. Reported production runs from September 2010 to August 2026, totalling 4,684,227 thousand cubic feet. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $1.3M, with roughly $228K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 8,202 thousand cubic feet a month. Its strongest month on the record we hold was December 2016, at 18,582 thousand cubic feet. In our own backtest, leases producing at this rate are forecast to within about 17% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about GEORGE 11

Who operates GEORGE 11?
GEORGE 11 is operated by Cimarex Energy Co., Railroad Commission of Texas operator number 153438.
Where is GEORGE 11?
GEORGE 11 is a Texas gas lease in Hemphill County, Texas, in Railroad Commission district 10. Its Railroad Commission lease number is 259738.
Is GEORGE 11 still producing?
GEORGE 11 is currently producing. The most recent month of production reported to the Railroad Commission of Texas for GEORGE 11 is August 2026.
How much has GEORGE 11 produced?
GEORGE 11 has reported 4,684,227 thousand cubic feet of gas (Mcf) to the Railroad Commission of Texas between September 2010 and August 2026, from 1 wellbore.
How much is GEORGE 11 worth?
The remaining production from GEORGE 11 is estimated to be worth about $1.3M in total as of 27 August 2026, within a range of $1.0M to $1.5M. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in GEORGE 11 is a fraction of it. The estimate fits an Arps decline curve to the production GEORGE 11 has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for GEORGE 11 is an estimate of value, not an offer and not an appraisal.
How much income does GEORGE 11 generate in a year?
GEORGE 11 is forecast to net about $228K across the whole undivided lease over the twelve months following 27 August 2026, before income tax. A royalty owner in GEORGE 11 receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

GEORGE 11 as filed with the Railroad Commission of Texas
OperatorCimarex Energy Co.
FieldBuffalo Wallow (Granite Wash)
CountyHemphill County, Texas
RRC district10
Lease number259738
Wellbores1
Reported production4,684,227 mcf
First reported
Last reported
Estimated royalty value$1.3M

Where GEORGE 11 sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.