SSU ALLOCATION #4

SSU ALLOCATION #4 is a Texas oil lease in Atascosa County, Railroad Commission district 01, operated by Xto Energy Inc. It has 1 wellbore on file with the Commission. Reported production runs from July 2015 to August 2026, totalling 467,060 barrels. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $8.8M, with roughly $3.1M expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 6,386 barrels a month. Its strongest month on the record we hold was October 2024, at 15,002 barrels. In our own backtest, leases producing at this rate are forecast to within about 17% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about SSU ALLOCATION #4

Who operates SSU ALLOCATION #4?
SSU ALLOCATION #4 is operated by Xto Energy Inc., Railroad Commission of Texas operator number 945936.
Where is SSU ALLOCATION #4?
SSU ALLOCATION #4 is a Texas oil lease in Atascosa County, Texas, in Railroad Commission district 01. Its Railroad Commission lease number is 18688.
Is SSU ALLOCATION #4 still producing?
SSU ALLOCATION #4 is currently producing. The most recent month of production reported to the Railroad Commission of Texas for SSU ALLOCATION #4 is August 2026.
How much has SSU ALLOCATION #4 produced?
SSU ALLOCATION #4 has reported 467,060 barrels of oil (bbl) to the Railroad Commission of Texas between July 2015 and August 2026, from 1 wellbore.
How much is SSU ALLOCATION #4 worth?
The remaining production from SSU ALLOCATION #4 is estimated to be worth about $8.8M in total as of 26 August 2026, within a range of $7.3M to $10.3M. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in SSU ALLOCATION #4 is a fraction of it. The estimate fits an Arps decline curve to the production SSU ALLOCATION #4 has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for SSU ALLOCATION #4 is an estimate of value, not an offer and not an appraisal.
How much income does SSU ALLOCATION #4 generate in a year?
SSU ALLOCATION #4 is forecast to net about $3.1M across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in SSU ALLOCATION #4 receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

SSU ALLOCATION #4 as filed with the Railroad Commission of Texas
OperatorXto Energy Inc.
FieldEagleville (Eagle Ford-1)
CountyAtascosa County, Texas
RRC district01
Lease number18688
Wellbores1
Reported production467,060 bbl
First reported
Last reported
Estimated royalty value$8.8M

Where SSU ALLOCATION #4 sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.