TRAMBLE-SALVATO UNIT

TRAMBLE-SALVATO UNIT is a Texas oil lease in Brazos County, Railroad Commission district 03, operated by Union Pacific Resources Company. It has 2 wellbores on file with the Commission. Reported production runs from March 1994 to August 2026, totalling 243,199 barrels. The lease is intermittent. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $63K, with roughly $14K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 200 barrels a month, about 100 per wellbore. Its strongest month on the record we hold was March 2026, at 843 barrels. In our own backtest, leases producing at this rate are forecast to within about 22% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about TRAMBLE-SALVATO UNIT

Who operates TRAMBLE-SALVATO UNIT?
TRAMBLE-SALVATO UNIT is operated by Union Pacific Resources Company, Railroad Commission of Texas operator number 876645.
Where is TRAMBLE-SALVATO UNIT?
TRAMBLE-SALVATO UNIT is a Texas oil lease in Brazos County, Texas, in Railroad Commission district 03. Its Railroad Commission lease number is 22331.
Is TRAMBLE-SALVATO UNIT still producing?
TRAMBLE-SALVATO UNIT is intermittent. The most recent month of production reported to the Railroad Commission of Texas for TRAMBLE-SALVATO UNIT is August 2026.
How much has TRAMBLE-SALVATO UNIT produced?
TRAMBLE-SALVATO UNIT has reported 243,199 barrels of oil (bbl) to the Railroad Commission of Texas between March 1994 and August 2026, from 2 wellbores.
How much is TRAMBLE-SALVATO UNIT worth?
The remaining production from TRAMBLE-SALVATO UNIT is estimated to be worth about $63K in total as of 26 August 2026, within a range of $49K to $76K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in TRAMBLE-SALVATO UNIT is a fraction of it. The estimate fits an Arps decline curve to the production TRAMBLE-SALVATO UNIT has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for TRAMBLE-SALVATO UNIT is an estimate of value, not an offer and not an appraisal.
How much income does TRAMBLE-SALVATO UNIT generate in a year?
TRAMBLE-SALVATO UNIT is forecast to net about $14K across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in TRAMBLE-SALVATO UNIT receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

TRAMBLE-SALVATO UNIT as filed with the Railroad Commission of Texas
OperatorUnion Pacific Resources Company
FieldGiddings (Austin Chalk-3)
CountyBrazos County, Texas
RRC district03
Lease number22331
Wellbores2
Reported production243,199 bbl
First reported
Last reported
Estimated royalty value$63K

Where TRAMBLE-SALVATO UNIT sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.