THOMPSON-PAINE OU #1

THOMPSON-PAINE OU #1 is a Texas oil lease in Austin County, Railroad Commission district 03, operated by Enhanced Energy Partners Corp. It has 2 wellbores on file with the Commission. Reported production runs from September 2016 to October 2018, totalling 12,985 barrels. The lease is not currently producing. Its strongest month on the record we hold was October 2016, at 2,651 barrels.

Key facts about THOMPSON-PAINE OU #1

Who operates THOMPSON-PAINE OU #1?
THOMPSON-PAINE OU #1 is operated by Enhanced Energy Partners Corp, Railroad Commission of Texas operator number 252470.
Where is THOMPSON-PAINE OU #1?
THOMPSON-PAINE OU #1 is a Texas oil lease in Austin County, Texas, in Railroad Commission district 03. Its Railroad Commission lease number is 27163.
Is THOMPSON-PAINE OU #1 still producing?
THOMPSON-PAINE OU #1 is not currently producing. The most recent month of production reported to the Railroad Commission of Texas for THOMPSON-PAINE OU #1 is October 2018.
How much has THOMPSON-PAINE OU #1 produced?
THOMPSON-PAINE OU #1 has reported 12,985 barrels of oil (bbl) to the Railroad Commission of Texas between September 2016 and October 2018, from 2 wellbores.

Lease record

THOMPSON-PAINE OU #1 as filed with the Railroad Commission of Texas
OperatorEnhanced Energy Partners Corp
FieldRaccoon Bend (Cockfield Lower)
CountyAustin County, Texas
RRC district03
Lease number27163
Wellbores2
Reported production12,985 bbl
First reported
Last reported

Where THOMPSON-PAINE OU #1 sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.