BILL SIMS
BILL SIMS is a Texas oil lease in Concho County, Railroad Commission district 7C, operated by Antle Operating, Inc. It has 2 wellbores on file with the Commission. Reported production runs from July 2013 to August 2026, totalling 14,850 barrels. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $12K, with roughly $2K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 8 barrels a month, about 4 per wellbore. Its strongest month on the record we hold was July 2017, at 239 barrels. In our own backtest, leases producing at this rate are forecast to within about 100% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.
Key facts about BILL SIMS
- Who operates BILL SIMS?
- BILL SIMS is operated by Antle Operating, Inc., Railroad Commission of Texas operator number 026646.
- Where is BILL SIMS?
- BILL SIMS is a Texas oil lease in Concho County, Texas, in Railroad Commission district 7C. Its Railroad Commission lease number is 18436.
- Is BILL SIMS still producing?
- BILL SIMS is currently producing. The most recent month of production reported to the Railroad Commission of Texas for BILL SIMS is August 2026.
- How much has BILL SIMS produced?
- BILL SIMS has reported 14,850 barrels of oil (bbl) to the Railroad Commission of Texas between July 2013 and August 2026, from 2 wellbores.
- How much is BILL SIMS worth?
- The remaining production from BILL SIMS is estimated to be worth about $12K in total as of 26 August 2026, within a range of $0 to $25K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in BILL SIMS is a fraction of it. The estimate fits an Arps decline curve to the production BILL SIMS has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for BILL SIMS is an estimate of value, not an offer and not an appraisal.
- How much income does BILL SIMS generate in a year?
- BILL SIMS is forecast to net about $2K across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in BILL SIMS receives a fraction of that, set by the decimal interest printed on their check stub.
Lease record
| Operator | Antle Operating, Inc. |
|---|---|
| Field | Paint Rock (Strawn Lime) |
| County | Concho County, Texas |
| RRC district | 7C |
| Lease number | 18436 |
| Wellbores | 2 |
| Reported production | 14,850 bbl |
| First reported | |
| Last reported | |
| Estimated royalty value | $12K |
Where BILL SIMS sits
Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .
Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.