UNIVERSITY 23-20

UNIVERSITY 23-20 is a Texas oil lease in Winkler County, Railroad Commission district 08, operated by Energen Resources Corporation. It has 1 wellbore on file with the Commission. Reported production runs from January 2011 to August 2026, totalling 223,089 barrels. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $1.3M, with roughly $310K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 424 barrels a month. Its strongest month on the record we hold was May 2019, at 2,990 barrels. In our own backtest, leases producing at this rate are forecast to within about 22% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about UNIVERSITY 23-20

Who operates UNIVERSITY 23-20?
UNIVERSITY 23-20 is operated by Energen Resources Corporation, Railroad Commission of Texas operator number 252002.
Where is UNIVERSITY 23-20?
UNIVERSITY 23-20 is a Texas oil lease in Winkler County, Texas, in Railroad Commission district 08. Its Railroad Commission lease number is 41024.
Is UNIVERSITY 23-20 still producing?
UNIVERSITY 23-20 is currently producing. The most recent month of production reported to the Railroad Commission of Texas for UNIVERSITY 23-20 is August 2026.
How much has UNIVERSITY 23-20 produced?
UNIVERSITY 23-20 has reported 223,089 barrels of oil (bbl) to the Railroad Commission of Texas between January 2011 and August 2026, from 1 wellbore.
How much is UNIVERSITY 23-20 worth?
The remaining production from UNIVERSITY 23-20 is estimated to be worth about $1.3M in total as of 27 August 2026, within a range of $1.0M to $1.6M. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in UNIVERSITY 23-20 is a fraction of it. The estimate fits an Arps decline curve to the production UNIVERSITY 23-20 has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for UNIVERSITY 23-20 is an estimate of value, not an offer and not an appraisal.
How much income does UNIVERSITY 23-20 generate in a year?
UNIVERSITY 23-20 is forecast to net about $310K across the whole undivided lease over the twelve months following 27 August 2026, before income tax. A royalty owner in UNIVERSITY 23-20 receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

UNIVERSITY 23-20 as filed with the Railroad Commission of Texas
OperatorEnergen Resources Corporation
FieldWar-Wink, S. (Wolfcamp)
CountyWinkler County, Texas
RRC district08
Lease number41024
Wellbores1
Reported production223,089 bbl
First reported
Last reported
Estimated royalty value$1.3M

Where UNIVERSITY 23-20 sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.