PARKER MINERALS 9F

PARKER MINERALS 9F is a Texas oil lease in Ector County, Railroad Commission district 08, operated by Sheridan Production Company, LLC. It has 1 wellbore on file with the Commission. Reported production runs from February 2017 to August 2026, totalling 258,024 barrels. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $1.3M, with roughly $423K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 608 barrels a month. Its strongest month on the record we hold was February 2017, at 11,594 barrels. In our own backtest, leases producing at this rate are forecast to within about 22% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about PARKER MINERALS 9F

Who operates PARKER MINERALS 9F?
PARKER MINERALS 9F is operated by Sheridan Production Company, LLC, Railroad Commission of Texas operator number 775854.
Where is PARKER MINERALS 9F?
PARKER MINERALS 9F is a Texas oil lease in Ector County, Texas, in Railroad Commission district 08. Its Railroad Commission lease number is 48642.
Is PARKER MINERALS 9F still producing?
PARKER MINERALS 9F is currently producing. The most recent month of production reported to the Railroad Commission of Texas for PARKER MINERALS 9F is August 2026.
How much has PARKER MINERALS 9F produced?
PARKER MINERALS 9F has reported 258,024 barrels of oil (bbl) to the Railroad Commission of Texas between February 2017 and August 2026, from 1 wellbore.
How much is PARKER MINERALS 9F worth?
The remaining production from PARKER MINERALS 9F is estimated to be worth about $1.3M in total as of 26 August 2026, within a range of $997K to $1.6M. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in PARKER MINERALS 9F is a fraction of it. The estimate fits an Arps decline curve to the production PARKER MINERALS 9F has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for PARKER MINERALS 9F is an estimate of value, not an offer and not an appraisal.
How much income does PARKER MINERALS 9F generate in a year?
PARKER MINERALS 9F is forecast to net about $423K across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in PARKER MINERALS 9F receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

PARKER MINERALS 9F as filed with the Railroad Commission of Texas
OperatorSheridan Production Company, LLC
FieldGoldsmith
CountyEctor County, Texas
RRC district08
Lease number48642
Wellbores1
Reported production258,024 bbl
First reported
Last reported
Estimated royalty value$1.3M

Where PARKER MINERALS 9F sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.