KENDRA-AMANDA PSA 3

KENDRA-AMANDA PSA 3 is a Texas oil lease in Midland County, Railroad Commission district 08, operated by Callon Petroleum Operating Co. It has 1 wellbore on file with the Commission. Reported production runs from January 2019 to August 2026, totalling 239,929 barrels. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $1.8M, with roughly $518K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 641 barrels a month. Its strongest month on the record we hold was February 2019, at 28,650 barrels. In our own backtest, leases producing at this rate are forecast to within about 22% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about KENDRA-AMANDA PSA 3

Who operates KENDRA-AMANDA PSA 3?
KENDRA-AMANDA PSA 3 is operated by Callon Petroleum Operating Co, Railroad Commission of Texas operator number 124828.
Where is KENDRA-AMANDA PSA 3?
KENDRA-AMANDA PSA 3 is a Texas oil lease in Midland County, Texas, in Railroad Commission district 08. Its Railroad Commission lease number is 51372.
Is KENDRA-AMANDA PSA 3 still producing?
KENDRA-AMANDA PSA 3 is currently producing. The most recent month of production reported to the Railroad Commission of Texas for KENDRA-AMANDA PSA 3 is August 2026.
How much has KENDRA-AMANDA PSA 3 produced?
KENDRA-AMANDA PSA 3 has reported 239,929 barrels of oil (bbl) to the Railroad Commission of Texas between January 2019 and August 2026, from 1 wellbore.
How much is KENDRA-AMANDA PSA 3 worth?
The remaining production from KENDRA-AMANDA PSA 3 is estimated to be worth about $1.8M in total as of 27 August 2026, within a range of $1.4M to $2.2M. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in KENDRA-AMANDA PSA 3 is a fraction of it. The estimate fits an Arps decline curve to the production KENDRA-AMANDA PSA 3 has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for KENDRA-AMANDA PSA 3 is an estimate of value, not an offer and not an appraisal.
How much income does KENDRA-AMANDA PSA 3 generate in a year?
KENDRA-AMANDA PSA 3 is forecast to net about $518K across the whole undivided lease over the twelve months following 27 August 2026, before income tax. A royalty owner in KENDRA-AMANDA PSA 3 receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

KENDRA-AMANDA PSA 3 as filed with the Railroad Commission of Texas
OperatorCallon Petroleum Operating Co
FieldSpraberry (Trend Area)
CountyMidland County, Texas
RRC district08
Lease number51372
Wellbores1
Reported production239,929 bbl
First reported
Last reported
Estimated royalty value$1.8M

Where KENDRA-AMANDA PSA 3 sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.