SAHARA 9
SAHARA 9 is a Texas oil lease in Fisher County, Railroad Commission district 08, operated by Clear Fork, Incorporated. It has 1 wellbore on file with the Commission. Reported production runs from November 2019 to August 2026, totalling 243,517 barrels. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $446K, with roughly $206K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 341 barrels a month. Its strongest month on the record we hold was March 2020, at 20,294 barrels. In our own backtest, leases producing at this rate are forecast to within about 22% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.
Key facts about SAHARA 9
- Who operates SAHARA 9?
- SAHARA 9 is operated by Clear Fork, Incorporated, Railroad Commission of Texas operator number 159500.
- Where is SAHARA 9?
- SAHARA 9 is a Texas oil lease in Fisher County, Texas, in Railroad Commission district 08. Its Railroad Commission lease number is 54029.
- Is SAHARA 9 still producing?
- SAHARA 9 is currently producing. The most recent month of production reported to the Railroad Commission of Texas for SAHARA 9 is August 2026.
- How much has SAHARA 9 produced?
- SAHARA 9 has reported 243,517 barrels of oil (bbl) to the Railroad Commission of Texas between November 2019 and August 2026, from 1 wellbore.
- How much is SAHARA 9 worth?
- The remaining production from SAHARA 9 is estimated to be worth about $446K in total as of 26 August 2026, within a range of $348K to $544K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in SAHARA 9 is a fraction of it. The estimate fits an Arps decline curve to the production SAHARA 9 has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for SAHARA 9 is an estimate of value, not an offer and not an appraisal.
- How much income does SAHARA 9 generate in a year?
- SAHARA 9 is forecast to net about $206K across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in SAHARA 9 receives a fraction of that, set by the decimal interest printed on their check stub.
Lease record
| Operator | Clear Fork, Incorporated |
|---|---|
| Field | Garden City, S. (Wolfcamp) |
| County | Fisher County, Texas |
| RRC district | 08 |
| Lease number | 54029 |
| Wellbores | 1 |
| Reported production | 243,517 bbl |
| First reported | |
| Last reported | |
| Estimated royalty value | $446K |
Where SAHARA 9 sits
Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .
Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.