MATADOR UNIVERSITY

MATADOR UNIVERSITY is a Texas oil lease in Andrews County, Railroad Commission district 08, operated by Yucca Energy, Inc. It has 2 wellbores on file with the Commission. Reported production runs from September 2013 to August 2026, totalling 15,187 barrels. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $143K, with roughly $28K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 37 barrels a month, about 19 per wellbore. Its strongest month on the record we hold was January 2018, at 225 barrels. In our own backtest, leases producing at this rate are forecast to within about 45% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about MATADOR UNIVERSITY

Who operates MATADOR UNIVERSITY?
MATADOR UNIVERSITY is operated by Yucca Energy, Inc., Railroad Commission of Texas operator number 950335.
Where is MATADOR UNIVERSITY?
MATADOR UNIVERSITY is a Texas oil lease in Andrews County, Texas, in Railroad Commission district 08. Its Railroad Commission lease number is 44517.
Is MATADOR UNIVERSITY still producing?
MATADOR UNIVERSITY is currently producing. The most recent month of production reported to the Railroad Commission of Texas for MATADOR UNIVERSITY is August 2026.
How much has MATADOR UNIVERSITY produced?
MATADOR UNIVERSITY has reported 15,187 barrels of oil (bbl) to the Railroad Commission of Texas between September 2013 and August 2026, from 2 wellbores.
How much is MATADOR UNIVERSITY worth?
The remaining production from MATADOR UNIVERSITY is estimated to be worth about $143K in total as of 27 August 2026, within a range of $79K to $207K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in MATADOR UNIVERSITY is a fraction of it. The estimate fits an Arps decline curve to the production MATADOR UNIVERSITY has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for MATADOR UNIVERSITY is an estimate of value, not an offer and not an appraisal.
How much income does MATADOR UNIVERSITY generate in a year?
MATADOR UNIVERSITY is forecast to net about $28K across the whole undivided lease over the twelve months following 27 August 2026, before income tax. A royalty owner in MATADOR UNIVERSITY receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

MATADOR UNIVERSITY as filed with the Railroad Commission of Texas
OperatorYucca Energy, Inc.
FieldShafter Lake, N. (San Andres)
CountyAndrews County, Texas
RRC district08
Lease number44517
Wellbores2
Reported production15,187 bbl
First reported
Last reported
Estimated royalty value$143K

Where MATADOR UNIVERSITY sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.