SODA LAKE "2"

SODA LAKE "2" is a Texas oil lease in Crane County, Railroad Commission district 08, operated by Sahara Operating Company. It has 1 wellbore on file with the Commission. Reported production runs from October 1995 to August 2026, totalling 146,587 barrels. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $276K, with roughly $53K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 87 barrels a month. Its strongest month on the record we hold was September 2021, at 530 barrels. In our own backtest, leases producing at this rate are forecast to within about 45% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about SODA LAKE "2"

Who operates SODA LAKE "2"?
SODA LAKE "2" is operated by Sahara Operating Company, Railroad Commission of Texas operator number 743279.
Where is SODA LAKE "2"?
SODA LAKE "2" is a Texas oil lease in Crane County, Texas, in Railroad Commission district 08. Its Railroad Commission lease number is 34736.
Is SODA LAKE "2" still producing?
SODA LAKE "2" is currently producing. The most recent month of production reported to the Railroad Commission of Texas for SODA LAKE "2" is August 2026.
How much has SODA LAKE "2" produced?
SODA LAKE "2" has reported 146,587 barrels of oil (bbl) to the Railroad Commission of Texas between October 1995 and August 2026, from 1 wellbore.
How much is SODA LAKE "2" worth?
The remaining production from SODA LAKE "2" is estimated to be worth about $276K in total as of 27 August 2026, within a range of $152K to $400K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in SODA LAKE "2" is a fraction of it. The estimate fits an Arps decline curve to the production SODA LAKE "2" has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for SODA LAKE "2" is an estimate of value, not an offer and not an appraisal.
How much income does SODA LAKE "2" generate in a year?
SODA LAKE "2" is forecast to net about $53K across the whole undivided lease over the twelve months following 27 August 2026, before income tax. A royalty owner in SODA LAKE "2" receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

SODA LAKE "2" as filed with the Railroad Commission of Texas
OperatorSahara Operating Company
FieldLyles (Clear Fork)
CountyCrane County, Texas
RRC district08
Lease number34736
Wellbores1
Reported production146,587 bbl
First reported
Last reported
Estimated royalty value$276K

Where SODA LAKE "2" sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.