WARD-RIHA

WARD-RIHA is a Texas oil lease in Dimmit County, Railroad Commission district 01, operated by Sage Energy Company. It has 1 wellbore on file with the Commission. Reported production runs from October 2008 to August 2026, totalling 79,788 barrels. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $653K, with roughly $121K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 212 barrels a month. Its strongest month on the record we hold was October 2020, at 1,012 barrels. In our own backtest, leases producing at this rate are forecast to within about 22% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about WARD-RIHA

Who operates WARD-RIHA?
WARD-RIHA is operated by Sage Energy Company, Railroad Commission of Texas operator number 743215.
Where is WARD-RIHA?
WARD-RIHA is a Texas oil lease in Dimmit County, Texas, in Railroad Commission district 01. Its Railroad Commission lease number is 15018.
Is WARD-RIHA still producing?
WARD-RIHA is currently producing. The most recent month of production reported to the Railroad Commission of Texas for WARD-RIHA is August 2026.
How much has WARD-RIHA produced?
WARD-RIHA has reported 79,788 barrels of oil (bbl) to the Railroad Commission of Texas between October 2008 and August 2026, from 1 wellbore.
How much is WARD-RIHA worth?
The remaining production from WARD-RIHA is estimated to be worth about $653K in total as of 26 August 2026, within a range of $509K to $796K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in WARD-RIHA is a fraction of it. The estimate fits an Arps decline curve to the production WARD-RIHA has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for WARD-RIHA is an estimate of value, not an offer and not an appraisal.
How much income does WARD-RIHA generate in a year?
WARD-RIHA is forecast to net about $121K across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in WARD-RIHA receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

WARD-RIHA as filed with the Railroad Commission of Texas
OperatorSage Energy Company
FieldPearsall (Austin Chalk)
CountyDimmit County, Texas
RRC district01
Lease number15018
Wellbores1
Reported production79,788 bbl
First reported
Last reported
Estimated royalty value$653K

Where WARD-RIHA sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.