GOLDSMITH ANDECTOR UNIT
GOLDSMITH ANDECTOR UNIT is a Texas gas lease in Ector County, Railroad Commission district 08, operated by Conocophillips Company. It has 1 wellbore on file with the Commission. Reported production runs from April 2015 to August 2026, totalling 621,143 thousand cubic feet. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $550K, with roughly $105K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 4,003 thousand cubic feet a month. Its strongest month on the record we hold was March 2019, at 10,267 thousand cubic feet. In our own backtest, leases producing at this rate are forecast to within about 17% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.
Key facts about GOLDSMITH ANDECTOR UNIT
- Who operates GOLDSMITH ANDECTOR UNIT?
- GOLDSMITH ANDECTOR UNIT is operated by Conocophillips Company, Railroad Commission of Texas operator number 172232.
- Where is GOLDSMITH ANDECTOR UNIT?
- GOLDSMITH ANDECTOR UNIT is a Texas gas lease in Ector County, Texas, in Railroad Commission district 08. Its Railroad Commission lease number is 276994.
- Is GOLDSMITH ANDECTOR UNIT still producing?
- GOLDSMITH ANDECTOR UNIT is currently producing. The most recent month of production reported to the Railroad Commission of Texas for GOLDSMITH ANDECTOR UNIT is August 2026.
- How much has GOLDSMITH ANDECTOR UNIT produced?
- GOLDSMITH ANDECTOR UNIT has reported 621,143 thousand cubic feet of gas (Mcf) to the Railroad Commission of Texas between April 2015 and August 2026, from 1 wellbore.
- How much is GOLDSMITH ANDECTOR UNIT worth?
- The remaining production from GOLDSMITH ANDECTOR UNIT is estimated to be worth about $550K in total as of 26 August 2026, within a range of $456K to $643K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in GOLDSMITH ANDECTOR UNIT is a fraction of it. The estimate fits an Arps decline curve to the production GOLDSMITH ANDECTOR UNIT has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for GOLDSMITH ANDECTOR UNIT is an estimate of value, not an offer and not an appraisal.
- How much income does GOLDSMITH ANDECTOR UNIT generate in a year?
- GOLDSMITH ANDECTOR UNIT is forecast to net about $105K across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in GOLDSMITH ANDECTOR UNIT receives a fraction of that, set by the decimal interest printed on their check stub.
Lease record
| Operator | Conocophillips Company |
|---|---|
| Field | Goldsmith (Clear Fork) |
| County | Ector County, Texas |
| RRC district | 08 |
| Lease number | 276994 |
| Wellbores | 1 |
| Reported production | 621,143 mcf |
| First reported | |
| Last reported | |
| Estimated royalty value | $550K |
Where GOLDSMITH ANDECTOR UNIT sits
Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .
Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.