PARKER TRUST 20

PARKER TRUST 20 is a Texas oil lease in Ector County, Railroad Commission district 08, operated by Sandridge Expl. And Prod., LLC. It has 1 wellbore on file with the Commission. Reported production runs from June 2010 to August 2026, totalling 25,564 barrels. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $4K, with roughly $722 expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 1 barrels a month. Its strongest month on the record we hold was October 2022, at 1 barrels. In our own backtest, leases producing at this rate are forecast to within about 100% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about PARKER TRUST 20

Who operates PARKER TRUST 20?
PARKER TRUST 20 is operated by Sandridge Expl. And Prod., LLC, Railroad Commission of Texas operator number 748011.
Where is PARKER TRUST 20?
PARKER TRUST 20 is a Texas oil lease in Ector County, Texas, in Railroad Commission district 08. Its Railroad Commission lease number is 40513.
Is PARKER TRUST 20 still producing?
PARKER TRUST 20 is currently producing. The most recent month of production reported to the Railroad Commission of Texas for PARKER TRUST 20 is August 2026.
How much has PARKER TRUST 20 produced?
PARKER TRUST 20 has reported 25,564 barrels of oil (bbl) to the Railroad Commission of Texas between June 2010 and August 2026, from 1 wellbore.
How much is PARKER TRUST 20 worth?
The remaining production from PARKER TRUST 20 is estimated to be worth about $4K in total as of 26 August 2026, within a range of $0 to $8K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in PARKER TRUST 20 is a fraction of it. The estimate fits an Arps decline curve to the production PARKER TRUST 20 has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for PARKER TRUST 20 is an estimate of value, not an offer and not an appraisal.
How much income does PARKER TRUST 20 generate in a year?
PARKER TRUST 20 is forecast to net about $722 across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in PARKER TRUST 20 receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

PARKER TRUST 20 as filed with the Railroad Commission of Texas
OperatorSandridge Expl. And Prod., LLC
FieldGoldsmith (Pennsylvanian)
CountyEctor County, Texas
RRC district08
Lease number40513
Wellbores1
Reported production25,564 bbl
First reported
Last reported
Estimated royalty value$4K

Where PARKER TRUST 20 sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.