SLATOR -A- TRACT II

SLATOR -A- TRACT II is a Texas oil lease in Ector County, Railroad Commission district 08, operated by Apache Corporation. It has 2 wellbores on file with the Commission. Reported production runs from March 2018 to August 2026, totalling 6,338 barrels. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $397K, with roughly $70K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 85 barrels a month, about 42 per wellbore. Its strongest month on the record we hold was March 2019, at 150 barrels. In our own backtest, leases producing at this rate are forecast to within about 45% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about SLATOR -A- TRACT II

Who operates SLATOR -A- TRACT II?
SLATOR -A- TRACT II is operated by Apache Corporation, Railroad Commission of Texas operator number 027200.
Where is SLATOR -A- TRACT II?
SLATOR -A- TRACT II is a Texas oil lease in Ector County, Texas, in Railroad Commission district 08. Its Railroad Commission lease number is 49725.
Is SLATOR -A- TRACT II still producing?
SLATOR -A- TRACT II is currently producing. The most recent month of production reported to the Railroad Commission of Texas for SLATOR -A- TRACT II is August 2026.
How much has SLATOR -A- TRACT II produced?
SLATOR -A- TRACT II has reported 6,338 barrels of oil (bbl) to the Railroad Commission of Texas between March 2018 and August 2026, from 2 wellbores.
How much is SLATOR -A- TRACT II worth?
The remaining production from SLATOR -A- TRACT II is estimated to be worth about $397K in total as of 26 August 2026, within a range of $219K to $576K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in SLATOR -A- TRACT II is a fraction of it. The estimate fits an Arps decline curve to the production SLATOR -A- TRACT II has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for SLATOR -A- TRACT II is an estimate of value, not an offer and not an appraisal.
How much income does SLATOR -A- TRACT II generate in a year?
SLATOR -A- TRACT II is forecast to net about $70K across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in SLATOR -A- TRACT II receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

SLATOR -A- TRACT II as filed with the Railroad Commission of Texas
OperatorApache Corporation
FieldGoldsmith, W. (San Andres)
CountyEctor County, Texas
RRC district08
Lease number49725
Wellbores2
Reported production6,338 bbl
First reported
Last reported
Estimated royalty value$397K

Where SLATOR -A- TRACT II sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.