BONNER

BONNER is a Texas gas lease in Freestone County, Railroad Commission district 05, operated by Chesapeake Operating, Inc. It has 1 wellbore on file with the Commission. Reported production runs from October 2006 to August 2026, totalling 294,417 thousand cubic feet. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $48K, with roughly $6K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 176 thousand cubic feet a month. Its strongest month on the record we hold was October 2016, at 1,826 thousand cubic feet. In our own backtest, leases producing at this rate are forecast to within about 22% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about BONNER

Who operates BONNER?
BONNER is operated by Chesapeake Operating, Inc., Railroad Commission of Texas operator number 147715.
Where is BONNER?
BONNER is a Texas gas lease in Freestone County, Texas, in Railroad Commission district 05. Its Railroad Commission lease number is 224810.
Is BONNER still producing?
BONNER is currently producing. The most recent month of production reported to the Railroad Commission of Texas for BONNER is August 2026.
How much has BONNER produced?
BONNER has reported 294,417 thousand cubic feet of gas (Mcf) to the Railroad Commission of Texas between October 2006 and August 2026, from 1 wellbore.
How much is BONNER worth?
The remaining production from BONNER is estimated to be worth about $48K in total as of 26 August 2026, within a range of $37K to $58K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in BONNER is a fraction of it. The estimate fits an Arps decline curve to the production BONNER has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for BONNER is an estimate of value, not an offer and not an appraisal.
How much income does BONNER generate in a year?
BONNER is forecast to net about $6K across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in BONNER receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

BONNER as filed with the Railroad Commission of Texas
OperatorChesapeake Operating, Inc.
FieldLoper (Cotton Valley Lime)
CountyFreestone County, Texas
RRC district05
Lease number224810
Wellbores1
Reported production294,417 mcf
First reported
Last reported
Estimated royalty value$48K

Where BONNER sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.