POST-MONTGOMERY

POST-MONTGOMERY is a Texas oil lease in Garza County, Railroad Commission district 8A, operated by Halvey Energy, LLC. It has 1 wellbore on file with the Commission. Reported production runs from December 2010 to August 2026, totalling 1,855 barrels. The lease is intermittent. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $20K, with roughly $4K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 6 barrels a month. Its strongest month on the record we hold was May 2025, at 15 barrels. In our own backtest, leases producing at this rate are forecast to within about 100% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about POST-MONTGOMERY

Who operates POST-MONTGOMERY?
POST-MONTGOMERY is operated by Halvey Energy, LLC, Railroad Commission of Texas operator number 347241.
Where is POST-MONTGOMERY?
POST-MONTGOMERY is a Texas oil lease in Garza County, Texas, in Railroad Commission district 8A. Its Railroad Commission lease number is 69710.
Is POST-MONTGOMERY still producing?
POST-MONTGOMERY is intermittent. The most recent month of production reported to the Railroad Commission of Texas for POST-MONTGOMERY is August 2026.
How much has POST-MONTGOMERY produced?
POST-MONTGOMERY has reported 1,855 barrels of oil (bbl) to the Railroad Commission of Texas between December 2010 and August 2026, from 1 wellbore.
How much is POST-MONTGOMERY worth?
The remaining production from POST-MONTGOMERY is estimated to be worth about $20K in total as of 26 August 2026, within a range of $0 to $40K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in POST-MONTGOMERY is a fraction of it. The estimate fits an Arps decline curve to the production POST-MONTGOMERY has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for POST-MONTGOMERY is an estimate of value, not an offer and not an appraisal.
How much income does POST-MONTGOMERY generate in a year?
POST-MONTGOMERY is forecast to net about $4K across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in POST-MONTGOMERY receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

POST-MONTGOMERY as filed with the Railroad Commission of Texas
OperatorHalvey Energy, LLC
FieldGarza
CountyGarza County, Texas
RRC district8A
Lease number69710
Wellbores1
Reported production1,855 bbl
First reported
Last reported
Estimated royalty value$20K

Where POST-MONTGOMERY sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.