GETHING -A- WATERFLOOD

GETHING -A- WATERFLOOD is a Texas oil lease in Gray County, Railroad Commission district 10, operated by Bradley Operating Co. It has 13 wellbores on file with the Commission. Reported production runs from January 1993 to August 2026, totalling 78,086 barrels. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $5K, with roughly $1K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 1 barrels a month. Its strongest month on the record we hold was June 2022, at 476 barrels. In our own backtest, leases producing at this rate are forecast to within about 100% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about GETHING -A- WATERFLOOD

Who operates GETHING -A- WATERFLOOD?
GETHING -A- WATERFLOOD is operated by Bradley Operating Co., Railroad Commission of Texas operator number 087255.
Where is GETHING -A- WATERFLOOD?
GETHING -A- WATERFLOOD is a Texas oil lease in Gray County, Texas, in Railroad Commission district 10. Its Railroad Commission lease number is 03726.
Is GETHING -A- WATERFLOOD still producing?
GETHING -A- WATERFLOOD is currently producing. The most recent month of production reported to the Railroad Commission of Texas for GETHING -A- WATERFLOOD is August 2026.
How much has GETHING -A- WATERFLOOD produced?
GETHING -A- WATERFLOOD has reported 78,086 barrels of oil (bbl) to the Railroad Commission of Texas between January 1993 and August 2026, from 13 wellbores.
How much is GETHING -A- WATERFLOOD worth?
The remaining production from GETHING -A- WATERFLOOD is estimated to be worth about $5K in total as of 27 August 2026, within a range of $0 to $10K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in GETHING -A- WATERFLOOD is a fraction of it. The estimate fits an Arps decline curve to the production GETHING -A- WATERFLOOD has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for GETHING -A- WATERFLOOD is an estimate of value, not an offer and not an appraisal.
How much income does GETHING -A- WATERFLOOD generate in a year?
GETHING -A- WATERFLOOD is forecast to net about $1K across the whole undivided lease over the twelve months following 27 August 2026, before income tax. A royalty owner in GETHING -A- WATERFLOOD receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

GETHING -A- WATERFLOOD as filed with the Railroad Commission of Texas
OperatorBradley Operating Co.
FieldPanhandle Gray County Field
CountyGray County, Texas
RRC district10
Lease number03726
Wellbores13
Reported production78,086 bbl
First reported
Last reported
Estimated royalty value$5K

Where GETHING -A- WATERFLOOD sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.