ABNEY 1215-ABNEY A (ALLOCATION)
ABNEY 1215-ABNEY A (ALLOCATION) is a Texas gas lease in Harrison County, Railroad Commission district 06, operated by Devon Energy Production Co, L.P. It has 1 wellbore on file with the Commission. Reported production runs from May 2011 to August 2026, totalling 4,285,665 thousand cubic feet. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $1.7M, with roughly $308K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 12,971 thousand cubic feet a month. Its strongest month on the record we hold was July 2016, at 21,422 thousand cubic feet. In our own backtest, leases producing at this rate are forecast to within about 18% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.
Key facts about ABNEY 1215-ABNEY A (ALLOCATION)
- Who operates ABNEY 1215-ABNEY A (ALLOCATION)?
- ABNEY 1215-ABNEY A (ALLOCATION) is operated by Devon Energy Production Co, L.P., Railroad Commission of Texas operator number 216378.
- Where is ABNEY 1215-ABNEY A (ALLOCATION)?
- ABNEY 1215-ABNEY A (ALLOCATION) is a Texas gas lease in Harrison County, Texas, in Railroad Commission district 06. Its Railroad Commission lease number is 265183.
- Is ABNEY 1215-ABNEY A (ALLOCATION) still producing?
- ABNEY 1215-ABNEY A (ALLOCATION) is currently producing. The most recent month of production reported to the Railroad Commission of Texas for ABNEY 1215-ABNEY A (ALLOCATION) is August 2026.
- How much has ABNEY 1215-ABNEY A (ALLOCATION) produced?
- ABNEY 1215-ABNEY A (ALLOCATION) has reported 4,285,665 thousand cubic feet of gas (Mcf) to the Railroad Commission of Texas between May 2011 and August 2026, from 1 wellbore.
- How much is ABNEY 1215-ABNEY A (ALLOCATION) worth?
- The remaining production from ABNEY 1215-ABNEY A (ALLOCATION) is estimated to be worth about $1.7M in total as of 27 August 2026, within a range of $1.4M to $2.0M. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in ABNEY 1215-ABNEY A (ALLOCATION) is a fraction of it. The estimate fits an Arps decline curve to the production ABNEY 1215-ABNEY A (ALLOCATION) has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for ABNEY 1215-ABNEY A (ALLOCATION) is an estimate of value, not an offer and not an appraisal.
- How much income does ABNEY 1215-ABNEY A (ALLOCATION) generate in a year?
- ABNEY 1215-ABNEY A (ALLOCATION) is forecast to net about $308K across the whole undivided lease over the twelve months following 27 August 2026, before income tax. A royalty owner in ABNEY 1215-ABNEY A (ALLOCATION) receives a fraction of that, set by the decimal interest printed on their check stub.
Lease record
| Operator | Devon Energy Production Co, L.P. |
|---|---|
| Field | Waskom (Cotton Valley) |
| County | Harrison County, Texas |
| RRC district | 06 |
| Lease number | 265183 |
| Wellbores | 1 |
| Reported production | 4,285,665 mcf |
| First reported | |
| Last reported | |
| Estimated royalty value | $1.7M |
Where ABNEY 1215-ABNEY A (ALLOCATION) sits
Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .
Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.