PANTHER WEST A1
PANTHER WEST A1 is a Texas oil lease in Howard County, Railroad Commission district 08, operated by Callon Petroleum Operating Co. It has 1 wellbore on file with the Commission. Reported production runs from August 2023 to August 2026, totalling 175,961 barrels. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $9.7M, with roughly $2.1M expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 2,779 barrels a month. Its strongest month on the record we hold was October 2023, at 20,332 barrels. In our own backtest, leases producing at this rate are forecast to within about 17% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.
Key facts about PANTHER WEST A1
- Who operates PANTHER WEST A1?
- PANTHER WEST A1 is operated by Callon Petroleum Operating Co, Railroad Commission of Texas operator number 124828.
- Where is PANTHER WEST A1?
- PANTHER WEST A1 is a Texas oil lease in Howard County, Texas, in Railroad Commission district 08. Its Railroad Commission lease number is 60777.
- Is PANTHER WEST A1 still producing?
- PANTHER WEST A1 is currently producing. The most recent month of production reported to the Railroad Commission of Texas for PANTHER WEST A1 is August 2026.
- How much has PANTHER WEST A1 produced?
- PANTHER WEST A1 has reported 175,961 barrels of oil (bbl) to the Railroad Commission of Texas between August 2023 and August 2026, from 1 wellbore.
- How much is PANTHER WEST A1 worth?
- The remaining production from PANTHER WEST A1 is estimated to be worth about $9.7M in total as of 27 August 2026, within a range of $8.1M to $11.4M. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in PANTHER WEST A1 is a fraction of it. The estimate fits an Arps decline curve to the production PANTHER WEST A1 has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for PANTHER WEST A1 is an estimate of value, not an offer and not an appraisal.
- How much income does PANTHER WEST A1 generate in a year?
- PANTHER WEST A1 is forecast to net about $2.1M across the whole undivided lease over the twelve months following 27 August 2026, before income tax. A royalty owner in PANTHER WEST A1 receives a fraction of that, set by the decimal interest printed on their check stub.
Lease record
| Operator | Callon Petroleum Operating Co |
|---|---|
| Field | Spraberry (Trend Area) |
| County | Howard County, Texas |
| RRC district | 08 |
| Lease number | 60777 |
| Wellbores | 1 |
| Reported production | 175,961 bbl |
| First reported | |
| Last reported | |
| Estimated royalty value | $9.7M |
Where PANTHER WEST A1 sits
Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .
Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.