BUBINGA B

BUBINGA B is a Texas gas lease in La Salle County, Railroad Commission district 01, operated by Rocc Operating, LLC. It has 1 wellbore on file with the Commission. Reported production runs from August 2023 to August 2026, totalling 3,358,429 thousand cubic feet. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $8.3M, with roughly $2.2M expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 59,249 thousand cubic feet a month. Its strongest month on the record we hold was October 2023, at 220,477 thousand cubic feet. In our own backtest, leases producing at this rate are forecast to within about 18% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about BUBINGA B

Who operates BUBINGA B?
BUBINGA B is operated by Rocc Operating, LLC, Railroad Commission of Texas operator number 100573.
Where is BUBINGA B?
BUBINGA B is a Texas gas lease in La Salle County, Texas, in Railroad Commission district 01. Its Railroad Commission lease number is 296507.
Is BUBINGA B still producing?
BUBINGA B is currently producing. The most recent month of production reported to the Railroad Commission of Texas for BUBINGA B is August 2026.
How much has BUBINGA B produced?
BUBINGA B has reported 3,358,429 thousand cubic feet of gas (Mcf) to the Railroad Commission of Texas between August 2023 and August 2026, from 1 wellbore.
How much is BUBINGA B worth?
The remaining production from BUBINGA B is estimated to be worth about $8.3M in total as of 26 August 2026, within a range of $6.8M to $9.8M. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in BUBINGA B is a fraction of it. The estimate fits an Arps decline curve to the production BUBINGA B has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for BUBINGA B is an estimate of value, not an offer and not an appraisal.
How much income does BUBINGA B generate in a year?
BUBINGA B is forecast to net about $2.2M across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in BUBINGA B receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

BUBINGA B as filed with the Railroad Commission of Texas
OperatorRocc Operating, LLC
FieldHawkville (Eagleford Shale)
CountyLa Salle County, Texas
RRC district01
Lease number296507
Wellbores1
Reported production3,358,429 mcf
First reported
Last reported
Estimated royalty value$8.3M

Where BUBINGA B sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.