PIERCE
PIERCE is a Texas gas lease in La Salle County, Railroad Commission district 01, operated by Carrizo (Eagle Ford) LLC. It has 1 wellbore on file with the Commission. Reported production runs from February 2013 to August 2026, totalling 455,283 thousand cubic feet. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $236K, with roughly $43K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 333 thousand cubic feet a month. Its strongest month on the record we hold was July 2017, at 5,263 thousand cubic feet. In our own backtest, leases producing at this rate are forecast to within about 22% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.
Key facts about PIERCE
- Who operates PIERCE?
- PIERCE is operated by Carrizo (Eagle Ford) LLC, Railroad Commission of Texas operator number 135316.
- Where is PIERCE?
- PIERCE is a Texas gas lease in La Salle County, Texas, in Railroad Commission district 01. Its Railroad Commission lease number is 271314.
- Is PIERCE still producing?
- PIERCE is currently producing. The most recent month of production reported to the Railroad Commission of Texas for PIERCE is August 2026.
- How much has PIERCE produced?
- PIERCE has reported 455,283 thousand cubic feet of gas (Mcf) to the Railroad Commission of Texas between February 2013 and August 2026, from 1 wellbore.
- How much is PIERCE worth?
- The remaining production from PIERCE is estimated to be worth about $236K in total as of 27 August 2026, within a range of $184K to $287K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in PIERCE is a fraction of it. The estimate fits an Arps decline curve to the production PIERCE has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for PIERCE is an estimate of value, not an offer and not an appraisal.
- How much income does PIERCE generate in a year?
- PIERCE is forecast to net about $43K across the whole undivided lease over the twelve months following 27 August 2026, before income tax. A royalty owner in PIERCE receives a fraction of that, set by the decimal interest printed on their check stub.
Lease record
| Operator | Carrizo (Eagle Ford) LLC |
|---|---|
| Field | Hawkville (Eagleford Shale) |
| County | La Salle County, Texas |
| RRC district | 01 |
| Lease number | 271314 |
| Wellbores | 1 |
| Reported production | 455,283 mcf |
| First reported | |
| Last reported | |
| Estimated royalty value | $236K |
Where PIERCE sits
Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .
Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.