WINFIELD-RAEMAY ALLOCATION D
WINFIELD-RAEMAY ALLOCATION D is a Texas oil lease in La Salle County, Railroad Commission district 01, operated by Carrizo (Eagle Ford) LLC. It has 1 wellbore on file with the Commission. Reported production runs from February 2017 to August 2026, totalling 219,832 barrels. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $2.4M, with roughly $527K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 701 barrels a month. Its strongest month on the record we hold was July 2017, at 19,394 barrels. In our own backtest, leases producing at this rate are forecast to within about 22% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.
Key facts about WINFIELD-RAEMAY ALLOCATION D
- Who operates WINFIELD-RAEMAY ALLOCATION D?
- WINFIELD-RAEMAY ALLOCATION D is operated by Carrizo (Eagle Ford) LLC, Railroad Commission of Texas operator number 135316.
- Where is WINFIELD-RAEMAY ALLOCATION D?
- WINFIELD-RAEMAY ALLOCATION D is a Texas oil lease in La Salle County, Texas, in Railroad Commission district 01. Its Railroad Commission lease number is 18946.
- Is WINFIELD-RAEMAY ALLOCATION D still producing?
- WINFIELD-RAEMAY ALLOCATION D is currently producing. The most recent month of production reported to the Railroad Commission of Texas for WINFIELD-RAEMAY ALLOCATION D is August 2026.
- How much has WINFIELD-RAEMAY ALLOCATION D produced?
- WINFIELD-RAEMAY ALLOCATION D has reported 219,832 barrels of oil (bbl) to the Railroad Commission of Texas between February 2017 and August 2026, from 1 wellbore.
- How much is WINFIELD-RAEMAY ALLOCATION D worth?
- The remaining production from WINFIELD-RAEMAY ALLOCATION D is estimated to be worth about $2.4M in total as of 27 August 2026, within a range of $1.9M to $2.9M. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in WINFIELD-RAEMAY ALLOCATION D is a fraction of it. The estimate fits an Arps decline curve to the production WINFIELD-RAEMAY ALLOCATION D has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for WINFIELD-RAEMAY ALLOCATION D is an estimate of value, not an offer and not an appraisal.
- How much income does WINFIELD-RAEMAY ALLOCATION D generate in a year?
- WINFIELD-RAEMAY ALLOCATION D is forecast to net about $527K across the whole undivided lease over the twelve months following 27 August 2026, before income tax. A royalty owner in WINFIELD-RAEMAY ALLOCATION D receives a fraction of that, set by the decimal interest printed on their check stub.
Lease record
| Operator | Carrizo (Eagle Ford) LLC |
|---|---|
| Field | Eagleville (Eagle Ford-1) |
| County | La Salle County, Texas |
| RRC district | 01 |
| Lease number | 18946 |
| Wellbores | 1 |
| Reported production | 219,832 bbl |
| First reported | |
| Last reported | |
| Estimated royalty value | $2.4M |
Where WINFIELD-RAEMAY ALLOCATION D sits
Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .
Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.