DENEB A

DENEB A is a Texas oil lease in Lavaca County, Railroad Commission district 02, operated by Baytex Energy USA, Inc. It has 1 wellbore on file with the Commission. Reported production runs from September 2025 to August 2026, totalling 49,682 barrels. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $1.8M, with roughly $1.5M expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 5,741 barrels a month. Its strongest month on the record we hold was October 2025, at 11,044 barrels. In our own backtest, leases producing at this rate are forecast to within about 17% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about DENEB A

Who operates DENEB A?
DENEB A is operated by Baytex Energy USA, Inc., Railroad Commission of Texas operator number 101444.
Where is DENEB A?
DENEB A is a Texas oil lease in Lavaca County, Texas, in Railroad Commission district 02. Its Railroad Commission lease number is 13153.
Is DENEB A still producing?
DENEB A is currently producing. The most recent month of production reported to the Railroad Commission of Texas for DENEB A is August 2026.
How much has DENEB A produced?
DENEB A has reported 49,682 barrels of oil (bbl) to the Railroad Commission of Texas between September 2025 and August 2026, from 1 wellbore.
How much is DENEB A worth?
The remaining production from DENEB A is estimated to be worth about $1.8M in total as of 26 August 2026, within a range of $1.5M to $2.1M. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in DENEB A is a fraction of it. The estimate fits an Arps decline curve to the production DENEB A has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for DENEB A is an estimate of value, not an offer and not an appraisal.
How much income does DENEB A generate in a year?
DENEB A is forecast to net about $1.5M across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in DENEB A receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

DENEB A as filed with the Railroad Commission of Texas
OperatorBaytex Energy USA, Inc.
FieldEagleville (Eagle Ford-2)
CountyLavaca County, Texas
RRC district02
Lease number13153
Wellbores1
Reported production49,682 bbl
First reported
Last reported
Estimated royalty value$1.8M

Where DENEB A sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.