FOSSIL STREATER GAS UNIT NO. 1

FOSSIL STREATER GAS UNIT NO. 1 is a Texas gas lease in Leon County, Railroad Commission district 05, operated by Gastar Exploration Texas, LP. It has 1 wellbore on file with the Commission. Reported production runs from August 2010 to August 2026, totalling 7,016,758 thousand cubic feet. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $3.0M, with roughly $454K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 21,904 thousand cubic feet a month. Its strongest month on the record we hold was May 2016, at 39,155 thousand cubic feet. In our own backtest, leases producing at this rate are forecast to within about 18% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about FOSSIL STREATER GAS UNIT NO. 1

Who operates FOSSIL STREATER GAS UNIT NO. 1?
FOSSIL STREATER GAS UNIT NO. 1 is operated by Gastar Exploration Texas, LP, Railroad Commission of Texas operator number 297086.
Where is FOSSIL STREATER GAS UNIT NO. 1?
FOSSIL STREATER GAS UNIT NO. 1 is a Texas gas lease in Leon County, Texas, in Railroad Commission district 05. Its Railroad Commission lease number is 259004.
Is FOSSIL STREATER GAS UNIT NO. 1 still producing?
FOSSIL STREATER GAS UNIT NO. 1 is currently producing. The most recent month of production reported to the Railroad Commission of Texas for FOSSIL STREATER GAS UNIT NO. 1 is August 2026.
How much has FOSSIL STREATER GAS UNIT NO. 1 produced?
FOSSIL STREATER GAS UNIT NO. 1 has reported 7,016,758 thousand cubic feet of gas (Mcf) to the Railroad Commission of Texas between August 2010 and August 2026, from 1 wellbore.
How much is FOSSIL STREATER GAS UNIT NO. 1 worth?
The remaining production from FOSSIL STREATER GAS UNIT NO. 1 is estimated to be worth about $3.0M in total as of 27 August 2026, within a range of $2.5M to $3.5M. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in FOSSIL STREATER GAS UNIT NO. 1 is a fraction of it. The estimate fits an Arps decline curve to the production FOSSIL STREATER GAS UNIT NO. 1 has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for FOSSIL STREATER GAS UNIT NO. 1 is an estimate of value, not an offer and not an appraisal.
How much income does FOSSIL STREATER GAS UNIT NO. 1 generate in a year?
FOSSIL STREATER GAS UNIT NO. 1 is forecast to net about $454K across the whole undivided lease over the twelve months following 27 August 2026, before income tax. A royalty owner in FOSSIL STREATER GAS UNIT NO. 1 receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

FOSSIL STREATER GAS UNIT NO. 1 as filed with the Railroad Commission of Texas
OperatorGastar Exploration Texas, LP
FieldHilltop Resort (Bossier)
CountyLeon County, Texas
RRC district05
Lease number259004
Wellbores1
Reported production7,016,758 mcf
First reported
Last reported
Estimated royalty value$3.0M

Where FOSSIL STREATER GAS UNIT NO. 1 sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.