THOMPSON, MILDRED
THOMPSON, MILDRED is a Texas gas lease in Limestone County, Railroad Commission district 05, operated by Mitchell Energy Corporation. It has 1 wellbore on file with the Commission. Reported production runs from January 1993 to August 2026, totalling 1,249,541 thousand cubic feet. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $5K, with roughly $741 expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 28 thousand cubic feet a month. Its strongest month on the record we hold was October 2017, at 1,835 thousand cubic feet. In our own backtest, leases producing at this rate are forecast to within about 45% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.
Key facts about THOMPSON, MILDRED
- Who operates THOMPSON, MILDRED?
- THOMPSON, MILDRED is operated by Mitchell Energy Corporation, Railroad Commission of Texas operator number 570655.
- Where is THOMPSON, MILDRED?
- THOMPSON, MILDRED is a Texas gas lease in Limestone County, Texas, in Railroad Commission district 05. Its Railroad Commission lease number is 137925.
- Is THOMPSON, MILDRED still producing?
- THOMPSON, MILDRED is currently producing. The most recent month of production reported to the Railroad Commission of Texas for THOMPSON, MILDRED is August 2026.
- How much has THOMPSON, MILDRED produced?
- THOMPSON, MILDRED has reported 1,249,541 thousand cubic feet of gas (Mcf) to the Railroad Commission of Texas between January 1993 and August 2026, from 1 wellbore.
- How much is THOMPSON, MILDRED worth?
- The remaining production from THOMPSON, MILDRED is estimated to be worth about $5K in total as of 26 August 2026, within a range of $3K to $8K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in THOMPSON, MILDRED is a fraction of it. The estimate fits an Arps decline curve to the production THOMPSON, MILDRED has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for THOMPSON, MILDRED is an estimate of value, not an offer and not an appraisal.
- How much income does THOMPSON, MILDRED generate in a year?
- THOMPSON, MILDRED is forecast to net about $741 across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in THOMPSON, MILDRED receives a fraction of that, set by the decimal interest printed on their check stub.
Lease record
| Operator | Mitchell Energy Corporation |
|---|---|
| Field | Oaks (Cotton Valley Sand) |
| County | Limestone County, Texas |
| RRC district | 05 |
| Lease number | 137925 |
| Wellbores | 1 |
| Reported production | 1,249,541 mcf |
| First reported | |
| Last reported | |
| Estimated royalty value | $5K |
Where THOMPSON, MILDRED sits
Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .
Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.