DUKE, BASIL
DUKE, BASIL is a Texas oil lease in Lipscomb County, Railroad Commission district 10, operated by BP America Production Company. It has 1 wellbore on file with the Commission. Reported production runs from July 2003 to August 2026, totalling 28,431 barrels. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $693K, with roughly $119K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 62 barrels a month. Its strongest month on the record we hold was December 2023, at 566 barrels. In our own backtest, leases producing at this rate are forecast to within about 45% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.
Key facts about DUKE, BASIL
- Who operates DUKE, BASIL?
- DUKE, BASIL is operated by BP America Production Company, Railroad Commission of Texas operator number 040798.
- Where is DUKE, BASIL?
- DUKE, BASIL is a Texas oil lease in Lipscomb County, Texas, in Railroad Commission district 10. Its Railroad Commission lease number is 07465.
- Is DUKE, BASIL still producing?
- DUKE, BASIL is currently producing. The most recent month of production reported to the Railroad Commission of Texas for DUKE, BASIL is August 2026.
- How much has DUKE, BASIL produced?
- DUKE, BASIL has reported 28,431 barrels of oil (bbl) to the Railroad Commission of Texas between July 2003 and August 2026, from 1 wellbore.
- How much is DUKE, BASIL worth?
- The remaining production from DUKE, BASIL is estimated to be worth about $693K in total as of 26 August 2026, within a range of $381K to $1.0M. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in DUKE, BASIL is a fraction of it. The estimate fits an Arps decline curve to the production DUKE, BASIL has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for DUKE, BASIL is an estimate of value, not an offer and not an appraisal.
- How much income does DUKE, BASIL generate in a year?
- DUKE, BASIL is forecast to net about $119K across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in DUKE, BASIL receives a fraction of that, set by the decimal interest printed on their check stub.
Lease record
| Operator | BP America Production Company |
|---|---|
| Field | Bradford (Tonkawa) |
| County | Lipscomb County, Texas |
| RRC district | 10 |
| Lease number | 07465 |
| Wellbores | 1 |
| Reported production | 28,431 bbl |
| First reported | |
| Last reported | |
| Estimated royalty value | $693K |
Where DUKE, BASIL sits
Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .
Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.