FIRST GOLD 29-0-39-34 D
FIRST GOLD 29-0-39-34 D is a Texas oil lease in Loving County, Railroad Commission district 08, operated by Anadarko E&P Onshore LLC. It has 1 wellbore on file with the Commission. Reported production runs from January 2025 to August 2026, totalling 469,690 barrels. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $24.5M, with roughly $9.1M expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 20,206 barrels a month. Its strongest month on the record we hold was February 2025, at 81,424 barrels. In our own backtest, leases producing at this rate are forecast to within about 18% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.
Key facts about FIRST GOLD 29-0-39-34 D
- Who operates FIRST GOLD 29-0-39-34 D?
- FIRST GOLD 29-0-39-34 D is operated by Anadarko E&P Onshore LLC, Railroad Commission of Texas operator number 020528.
- Where is FIRST GOLD 29-0-39-34 D?
- FIRST GOLD 29-0-39-34 D is a Texas oil lease in Loving County, Texas, in Railroad Commission district 08. Its Railroad Commission lease number is 63522.
- Is FIRST GOLD 29-0-39-34 D still producing?
- FIRST GOLD 29-0-39-34 D is currently producing. The most recent month of production reported to the Railroad Commission of Texas for FIRST GOLD 29-0-39-34 D is August 2026.
- How much has FIRST GOLD 29-0-39-34 D produced?
- FIRST GOLD 29-0-39-34 D has reported 469,690 barrels of oil (bbl) to the Railroad Commission of Texas between January 2025 and August 2026, from 1 wellbore.
- How much is FIRST GOLD 29-0-39-34 D worth?
- The remaining production from FIRST GOLD 29-0-39-34 D is estimated to be worth about $24.5M in total as of 27 August 2026, within a range of $20.1M to $28.9M. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in FIRST GOLD 29-0-39-34 D is a fraction of it. The estimate fits an Arps decline curve to the production FIRST GOLD 29-0-39-34 D has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for FIRST GOLD 29-0-39-34 D is an estimate of value, not an offer and not an appraisal.
- How much income does FIRST GOLD 29-0-39-34 D generate in a year?
- FIRST GOLD 29-0-39-34 D is forecast to net about $9.1M across the whole undivided lease over the twelve months following 27 August 2026, before income tax. A royalty owner in FIRST GOLD 29-0-39-34 D receives a fraction of that, set by the decimal interest printed on their check stub.
Lease record
| Operator | Anadarko E&P Onshore LLC |
|---|---|
| Field | Phantom (Wolfcamp) |
| County | Loving County, Texas |
| RRC district | 08 |
| Lease number | 63522 |
| Wellbores | 1 |
| Reported production | 469,690 bbl |
| First reported | |
| Last reported | |
| Estimated royalty value | $24.5M |
Where FIRST GOLD 29-0-39-34 D sits
Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .
Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.