HALL A1
HALL A1 is a Texas oil lease in Martin County, Railroad Commission district 08, operated by Qep Energy Company. It has 1 wellbore on file with the Commission. Reported production runs from August 2019 to August 2026, totalling 238,605 barrels. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $433K, with roughly $254K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 468 barrels a month. Its strongest month on the record we hold was October 2019, at 21,495 barrels. In our own backtest, leases producing at this rate are forecast to within about 22% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.
Key facts about HALL A1
- Who operates HALL A1?
- HALL A1 is operated by Qep Energy Company, Railroad Commission of Texas operator number 684474.
- Where is HALL A1?
- HALL A1 is a Texas oil lease in Martin County, Texas, in Railroad Commission district 08. Its Railroad Commission lease number is 53006.
- Is HALL A1 still producing?
- HALL A1 is currently producing. The most recent month of production reported to the Railroad Commission of Texas for HALL A1 is August 2026.
- How much has HALL A1 produced?
- HALL A1 has reported 238,605 barrels of oil (bbl) to the Railroad Commission of Texas between August 2019 and August 2026, from 1 wellbore.
- How much is HALL A1 worth?
- The remaining production from HALL A1 is estimated to be worth about $433K in total as of 26 August 2026, within a range of $338K to $529K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in HALL A1 is a fraction of it. The estimate fits an Arps decline curve to the production HALL A1 has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for HALL A1 is an estimate of value, not an offer and not an appraisal.
- How much income does HALL A1 generate in a year?
- HALL A1 is forecast to net about $254K across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in HALL A1 receives a fraction of that, set by the decimal interest printed on their check stub.
Lease record
| Operator | Qep Energy Company |
|---|---|
| Field | Spraberry (Trend Area) |
| County | Martin County, Texas |
| RRC district | 08 |
| Lease number | 53006 |
| Wellbores | 1 |
| Reported production | 238,605 bbl |
| First reported | |
| Last reported | |
| Estimated royalty value | $433K |
Where HALL A1 sits
Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .
Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.