DREAM CATCHER
DREAM CATCHER is a Texas gas lease in Nacogdoches County, Railroad Commission district 06, operated by Sonerra Resources Corporation. It has 1 wellbore on file with the Commission. Reported production runs from March 2007 to August 2026, totalling 926,523 thousand cubic feet. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $5K, with roughly $678 expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 36 thousand cubic feet a month. Its strongest month on the record we hold was May 2016, at 2,066 thousand cubic feet. In our own backtest, leases producing at this rate are forecast to within about 45% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.
Key facts about DREAM CATCHER
- Who operates DREAM CATCHER?
- DREAM CATCHER is operated by Sonerra Resources Corporation, Railroad Commission of Texas operator number 801643.
- Where is DREAM CATCHER?
- DREAM CATCHER is a Texas gas lease in Nacogdoches County, Texas, in Railroad Commission district 06. Its Railroad Commission lease number is 227329.
- Is DREAM CATCHER still producing?
- DREAM CATCHER is currently producing. The most recent month of production reported to the Railroad Commission of Texas for DREAM CATCHER is August 2026.
- How much has DREAM CATCHER produced?
- DREAM CATCHER has reported 926,523 thousand cubic feet of gas (Mcf) to the Railroad Commission of Texas between March 2007 and August 2026, from 1 wellbore.
- How much is DREAM CATCHER worth?
- The remaining production from DREAM CATCHER is estimated to be worth about $5K in total as of 27 August 2026, within a range of $3K to $7K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in DREAM CATCHER is a fraction of it. The estimate fits an Arps decline curve to the production DREAM CATCHER has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for DREAM CATCHER is an estimate of value, not an offer and not an appraisal.
- How much income does DREAM CATCHER generate in a year?
- DREAM CATCHER is forecast to net about $678 across the whole undivided lease over the twelve months following 27 August 2026, before income tax. A royalty owner in DREAM CATCHER receives a fraction of that, set by the decimal interest printed on their check stub.
Lease record
| Operator | Sonerra Resources Corporation |
|---|---|
| Field | Oakridge (Travis Peak) |
| County | Nacogdoches County, Texas |
| RRC district | 06 |
| Lease number | 227329 |
| Wellbores | 1 |
| Reported production | 926,523 mcf |
| First reported | |
| Last reported | |
| Estimated royalty value | $5K |
Where DREAM CATCHER sits
Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .
Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.