TAYLOR-LINK (YATES)

TAYLOR-LINK (YATES) is a Texas oil lease in Pecos County, Railroad Commission district 08, operated by Mid-States Operating Company. It has 4 wellbores on file with the Commission. Reported production runs from August 2013 to August 2026, totalling 4,206 barrels. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $119K, with roughly $23K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 25 barrels a month, about 6 per wellbore. Its strongest month on the record we hold was April 2025, at 117 barrels. In our own backtest, leases producing at this rate are forecast to within about 45% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about TAYLOR-LINK (YATES)

Who operates TAYLOR-LINK (YATES)?
TAYLOR-LINK (YATES) is operated by Mid-States Operating Company, Railroad Commission of Texas operator number 566121.
Where is TAYLOR-LINK (YATES)?
TAYLOR-LINK (YATES) is a Texas oil lease in Pecos County, Texas, in Railroad Commission district 08. Its Railroad Commission lease number is 44612.
Is TAYLOR-LINK (YATES) still producing?
TAYLOR-LINK (YATES) is currently producing. The most recent month of production reported to the Railroad Commission of Texas for TAYLOR-LINK (YATES) is August 2026.
How much has TAYLOR-LINK (YATES) produced?
TAYLOR-LINK (YATES) has reported 4,206 barrels of oil (bbl) to the Railroad Commission of Texas between August 2013 and August 2026, from 4 wellbores.
How much is TAYLOR-LINK (YATES) worth?
The remaining production from TAYLOR-LINK (YATES) is estimated to be worth about $119K in total as of 27 August 2026, within a range of $65K to $172K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in TAYLOR-LINK (YATES) is a fraction of it. The estimate fits an Arps decline curve to the production TAYLOR-LINK (YATES) has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for TAYLOR-LINK (YATES) is an estimate of value, not an offer and not an appraisal.
How much income does TAYLOR-LINK (YATES) generate in a year?
TAYLOR-LINK (YATES) is forecast to net about $23K across the whole undivided lease over the twelve months following 27 August 2026, before income tax. A royalty owner in TAYLOR-LINK (YATES) receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

TAYLOR-LINK (YATES) as filed with the Railroad Commission of Texas
OperatorMid-States Operating Company
FieldTaylor Link
CountyPecos County, Texas
RRC district08
Lease number44612
Wellbores4
Reported production4,206 bbl
First reported
Last reported
Estimated royalty value$119K

Where TAYLOR-LINK (YATES) sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.