UNSICKER

UNSICKER is a Texas oil lease in Pecos County, Railroad Commission district 08, operated by Graham, H.E. It has 8 wellbores on file with the Commission. Reported production runs from January 1993 to August 2026, totalling 47,692 barrels. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $198K, with roughly $38K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 62 barrels a month, about 8 per wellbore. Its strongest month on the record we hold was February 2018, at 201 barrels. In our own backtest, leases producing at this rate are forecast to within about 45% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about UNSICKER

Who operates UNSICKER?
UNSICKER is operated by Graham, H.E., Railroad Commission of Texas operator number 323396.
Where is UNSICKER?
UNSICKER is a Texas oil lease in Pecos County, Texas, in Railroad Commission district 08. Its Railroad Commission lease number is 04736.
Is UNSICKER still producing?
UNSICKER is currently producing. The most recent month of production reported to the Railroad Commission of Texas for UNSICKER is August 2026.
How much has UNSICKER produced?
UNSICKER has reported 47,692 barrels of oil (bbl) to the Railroad Commission of Texas between January 1993 and August 2026, from 8 wellbores.
How much is UNSICKER worth?
The remaining production from UNSICKER is estimated to be worth about $198K in total as of 26 August 2026, within a range of $109K to $287K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in UNSICKER is a fraction of it. The estimate fits an Arps decline curve to the production UNSICKER has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for UNSICKER is an estimate of value, not an offer and not an appraisal.
How much income does UNSICKER generate in a year?
UNSICKER is forecast to net about $38K across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in UNSICKER receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

UNSICKER as filed with the Railroad Commission of Texas
OperatorGraham, H.E.
FieldPecos Valley (High Gravity)
CountyPecos County, Texas
RRC district08
Lease number04736
Wellbores8
Reported production47,692 bbl
First reported
Last reported
Estimated royalty value$198K

Where UNSICKER sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.