BIVINS D

BIVINS D is a Texas gas lease in Potter County, Railroad Commission district 10, operated by Seagull Midcon Inc. It has 1 wellbore on file with the Commission. Reported production runs from January 1993 to August 2026, totalling 1,528,068 thousand cubic feet. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $216K, with roughly $33K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 1,428 thousand cubic feet a month. Its strongest month on the record we hold was October 2019, at 3,293 thousand cubic feet. In our own backtest, leases producing at this rate are forecast to within about 17% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about BIVINS D

Who operates BIVINS D?
BIVINS D is operated by Seagull Midcon Inc., Railroad Commission of Texas operator number 761707.
Where is BIVINS D?
BIVINS D is a Texas gas lease in Potter County, Texas, in Railroad Commission district 10. Its Railroad Commission lease number is 035032.
Is BIVINS D still producing?
BIVINS D is currently producing. The most recent month of production reported to the Railroad Commission of Texas for BIVINS D is August 2026.
How much has BIVINS D produced?
BIVINS D has reported 1,528,068 thousand cubic feet of gas (Mcf) to the Railroad Commission of Texas between January 1993 and August 2026, from 1 wellbore.
How much is BIVINS D worth?
The remaining production from BIVINS D is estimated to be worth about $216K in total as of 26 August 2026, within a range of $179K to $252K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in BIVINS D is a fraction of it. The estimate fits an Arps decline curve to the production BIVINS D has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for BIVINS D is an estimate of value, not an offer and not an appraisal.
How much income does BIVINS D generate in a year?
BIVINS D is forecast to net about $33K across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in BIVINS D receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

BIVINS D as filed with the Railroad Commission of Texas
OperatorSeagull Midcon Inc.
FieldPanhandle, West
CountyPotter County, Texas
RRC district10
Lease number035032
Wellbores1
Reported production1,528,068 mcf
First reported
Last reported
Estimated royalty value$216K

Where BIVINS D sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.