LYDA 9

LYDA 9 is a Texas oil lease in Reeves County, Railroad Commission district 08, operated by Thompson, J. Cleo. It has 4 wellbores on file with the Commission. Reported production runs from August 2012 to August 2026, totalling 340,073 barrels. The lease is intermittent. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $164K, with roughly $30K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 31 barrels a month, about 8 per wellbore. Its strongest month on the record we hold was August 2017, at 5,346 barrels. In our own backtest, leases producing at this rate are forecast to within about 45% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.

Key facts about LYDA 9

Who operates LYDA 9?
LYDA 9 is operated by Thompson, J. Cleo, Railroad Commission of Texas operator number 855610.
Where is LYDA 9?
LYDA 9 is a Texas oil lease in Reeves County, Texas, in Railroad Commission district 08. Its Railroad Commission lease number is 42962.
Is LYDA 9 still producing?
LYDA 9 is intermittent. The most recent month of production reported to the Railroad Commission of Texas for LYDA 9 is August 2026.
How much has LYDA 9 produced?
LYDA 9 has reported 340,073 barrels of oil (bbl) to the Railroad Commission of Texas between August 2012 and August 2026, from 4 wellbores.
How much is LYDA 9 worth?
The remaining production from LYDA 9 is estimated to be worth about $164K in total as of 26 August 2026, within a range of $90K to $237K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in LYDA 9 is a fraction of it. The estimate fits an Arps decline curve to the production LYDA 9 has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for LYDA 9 is an estimate of value, not an offer and not an appraisal.
How much income does LYDA 9 generate in a year?
LYDA 9 is forecast to net about $30K across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in LYDA 9 receives a fraction of that, set by the decimal interest printed on their check stub.

Lease record

LYDA 9 as filed with the Railroad Commission of Texas
OperatorThompson, J. Cleo
FieldWolfbone (Trend Area)
CountyReeves County, Texas
RRC district08
Lease number42962
Wellbores4
Reported production340,073 bbl
First reported
Last reported
Estimated royalty value$164K

Where LYDA 9 sits

Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .

Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.