BP WOMBAT DRILLING UNIT
BP WOMBAT DRILLING UNIT is a Texas gas lease in San Augustine County, Railroad Commission district 06, operated by BP America Production Company. It has 1 wellbore on file with the Commission. Reported production runs from May 2019 to August 2026, totalling 9,997,120 thousand cubic feet. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $3.0M, with roughly $593K expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 28,956 thousand cubic feet a month. Its strongest month on the record we hold was August 2019, at 489,553 thousand cubic feet. In our own backtest, leases producing at this rate are forecast to within about 18% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.
Key facts about BP WOMBAT DRILLING UNIT
- Who operates BP WOMBAT DRILLING UNIT?
- BP WOMBAT DRILLING UNIT is operated by BP America Production Company, Railroad Commission of Texas operator number 040798.
- Where is BP WOMBAT DRILLING UNIT?
- BP WOMBAT DRILLING UNIT is a Texas gas lease in San Augustine County, Texas, in Railroad Commission district 06. Its Railroad Commission lease number is 287368.
- Is BP WOMBAT DRILLING UNIT still producing?
- BP WOMBAT DRILLING UNIT is currently producing. The most recent month of production reported to the Railroad Commission of Texas for BP WOMBAT DRILLING UNIT is August 2026.
- How much has BP WOMBAT DRILLING UNIT produced?
- BP WOMBAT DRILLING UNIT has reported 9,997,120 thousand cubic feet of gas (Mcf) to the Railroad Commission of Texas between May 2019 and August 2026, from 1 wellbore.
- How much is BP WOMBAT DRILLING UNIT worth?
- The remaining production from BP WOMBAT DRILLING UNIT is estimated to be worth about $3.0M in total as of 27 August 2026, within a range of $2.5M to $3.6M. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in BP WOMBAT DRILLING UNIT is a fraction of it. The estimate fits an Arps decline curve to the production BP WOMBAT DRILLING UNIT has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for BP WOMBAT DRILLING UNIT is an estimate of value, not an offer and not an appraisal.
- How much income does BP WOMBAT DRILLING UNIT generate in a year?
- BP WOMBAT DRILLING UNIT is forecast to net about $593K across the whole undivided lease over the twelve months following 27 August 2026, before income tax. A royalty owner in BP WOMBAT DRILLING UNIT receives a fraction of that, set by the decimal interest printed on their check stub.
Lease record
| Operator | BP America Production Company |
|---|---|
| Field | Carthage (Haynesville Shale) |
| County | San Augustine County, Texas |
| RRC district | 06 |
| Lease number | 287368 |
| Wellbores | 1 |
| Reported production | 9,997,120 mcf |
| First reported | |
| Last reported | |
| Estimated royalty value | $3.0M |
Where BP WOMBAT DRILLING UNIT sits
Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .
Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.