BSM UNIT A19
BSM UNIT A19 is a Texas gas lease in San Augustine County, Railroad Commission district 06, operated by Encana Oil & Gas(USA) Inc. It has 1 wellbore on file with the Commission. Reported production runs from November 2011 to August 2026, totalling 1,995,685 thousand cubic feet. The lease is currently producing. Fitting a decline curve to that history and pricing the remaining production at today's forward curve values the whole lease — a 100% undivided interest — at about $5K, with roughly $670 expected over the next twelve months. An individual royalty owner receives their own decimal interest times that figure. Over the last twelve months on file it averaged 21 thousand cubic feet a month. Its strongest month on the record we hold was May 2016, at 6,504 thousand cubic feet. In our own backtest, leases producing at this rate are forecast to within about 45% of what they went on to produce, and that measured error is the range shown on the page rather than a confidence of our own devising.
Key facts about BSM UNIT A19
- Who operates BSM UNIT A19?
- BSM UNIT A19 is operated by Encana Oil & Gas(USA) Inc., Railroad Commission of Texas operator number 251691.
- Where is BSM UNIT A19?
- BSM UNIT A19 is a Texas gas lease in San Augustine County, Texas, in Railroad Commission district 06. Its Railroad Commission lease number is 263426.
- Is BSM UNIT A19 still producing?
- BSM UNIT A19 is currently producing. The most recent month of production reported to the Railroad Commission of Texas for BSM UNIT A19 is August 2026.
- How much has BSM UNIT A19 produced?
- BSM UNIT A19 has reported 1,995,685 thousand cubic feet of gas (Mcf) to the Railroad Commission of Texas between November 2011 and August 2026, from 1 wellbore.
- How much is BSM UNIT A19 worth?
- The remaining production from BSM UNIT A19 is estimated to be worth about $5K in total as of 26 August 2026, within a range of $3K to $8K. That figure is the whole lease, undivided — not any one owner's share. A royalty interest in BSM UNIT A19 is a fraction of it. The estimate fits an Arps decline curve to the production BSM UNIT A19 has already reported, prices the remaining production at the current forward strip, and discounts it at 12% a year. The figure shown for BSM UNIT A19 is an estimate of value, not an offer and not an appraisal.
- How much income does BSM UNIT A19 generate in a year?
- BSM UNIT A19 is forecast to net about $670 across the whole undivided lease over the twelve months following 26 August 2026, before income tax. A royalty owner in BSM UNIT A19 receives a fraction of that, set by the decimal interest printed on their check stub.
Lease record
| Operator | Encana Oil & Gas(USA) Inc. |
|---|---|
| Field | Carthage (Haynesville Shale) |
| County | San Augustine County, Texas |
| RRC district | 06 |
| Lease number | 263426 |
| Wellbores | 1 |
| Reported production | 1,995,685 mcf |
| First reported | |
| Last reported | |
| Estimated royalty value | $5K |
Where BSM UNIT A19 sits
Source: Railroad Commission of Texas lease production records, complete through . Figures on this page were computed on .
Production figures are as reported to the Railroad Commission of Texas. The value shown is an estimate produced by fitting a decline curve to that reported history; it is not an offer or an appraisal. How this estimate is calculated.